Colesville Park and Ride Low Impact Development Retrofit

As a part of the County's effort in protecting our waters, the Colesville Park & Ride Lot was selected for a low impact development (LID) retrofit project to help reduce stormwater pollution that drains into our streams. LID projects generally involve small-scale stormwater practices on county property to capture water from roadways, parking lots, and sidewalks during storms.

Check out the Project Schedule at the bottom of the page for more information!

 

 

PROJECT FACTS*
Project Status: In Design
Total Drainage Area: 1.9 Ac
Total Percent Impervious: 72%
Total Stream Project Length: N/A
Estimate Costs: $390,000
Monitoring: No
Watershed: Paint Branch
Contact: Brett Long
Email: Brett.Long@montgomerycountymd.gov
Phone: 240.499.8531

     *Information is subject to change

 

     Image of Colesville Park and Ride

    To download, click (PDF, 1.20 MB)

 

Public Events and Site Schedule*
Event  Date / TIme Location
Survey and Site Analysis Winter 2013  
Preliminary Site Assessment Winter 2013  
Concept Design Plans Spring 2014  
Final Plans Winter 2014  
Construction Winter/Spring 2015  

*Project schedule is tentative and dates are subject to change.