Columbia Towers Stormwater Pond

As a part of the County's effort in protecting our waters, the stormwater pond (Pond - 10906) within the Columbia Towers community was selected for upgrade to help reduce stormwater pollution draining into our streams.

Various public events will be held through out the project phases for residents to learn about the project and to provide input on the design of the project. Check out the Project Schedule and Documents table at the bottom of the page for more information!

                                    

 

PROJECT FACTS
Project Status: In Design
Total Drainage Area: 11.05 Ac
Total Percent Impervious: 46%
Total Stream Project Length: N/A
Estimated Cost: TBD
Monitoring: No
Watershed: Anacostia River
Contact: Jane McDonough
Email: Jane.McDonough@montgomerycountymd.gov
Phone: (240) 499-853

       *Information is subject to change

       Image of Columbia Towers Asset 10906

       To download, click (PDF, 1.25 MB).

 

Public Events and Project Schedule
Event Date / Time Location
Survey and Site Analysis Spring 2013  
Preliminary Site Assessment Summer 2013  
Public Meeting TBD TBD
Concept Design Plans Spring 2014  
Community Walk Fall 2014 TBD
Final Plans Winter 2014  
Construction Winter 2014 / Spring 2015  

*Project schedule is tentative and dates are subject to change.