Dennis Avenue Green Streets

As a part of the County's effort in protecting our waters, the Department of Environmental Protection (MCDEP) and Department of Transportation (MCDOT) are collaborating on a Green Streets project in the Dennis Avenue area. Green Streets projects generally involve installing small-scale stormwater practices within the County's right-of-way to capture water from roadways and sidewalks during storms.

Various public events will be held through out the project phases for residents to learn about the project and to provide input on the design of the project. Go to the "Project Schedule and Documents" tab for more information.

                                     

 

PROJECT FACTS
Project Status: In Construction
Total Drainage Area: TBD
Total Percent Impervious: TBD
Total Stream Project Length: N/A
Estimated Cost: TBD
Monitoring: No
Watershed: Anacostia River
Contact: Jennifer St. John
Email: Jennifer.St.John@montgomerycountymd.gov
Phone: (240) 777-7740

        *Information is subject to change

       Image of Dennis Avenue Green Streets 

      To download, click (PDF, 6.87 MB).

 

Construction Status
ID Type Phase Status   ID Type Phase Status
1 Tree Box 2b Dropped   33 Tree Box 1 Complete
2 Tree Box 2b Dropped   47A Parking Pad 3 In construction   
2A Tree Box 2b In construction   47B Bioswale 3 In construction
3A Tree Box 2b In construction   48 Parking Pad 3 In construction
3 Swale Curb Extension 1 Complete   49 Bioswale 3 In construction
4 Swale Curb Extension 2b In construction   50 Tree Box 3 In construction
5 Swale Curb Extension 2b In construction   51A Swale Curb Extension 3 In construction
6  Rainstore & Infiltration 2b In construction   51B Bioswale 3 In construction
7 Swale 2b In construction   52A Parking Pad 3 In construction
8 Tree Box 1 Complete   52B Swale Curb Extension 3 In construction
9 Bioretention 2b In construction   53 Swale Curb Extension 3 In construction
9A Tree Box 1 Complete   54 Swale Curb Extension 3 In construction
10 Bioretention 2b In construction   55 Swale Curb Extension 3 In construction
11 Bioretention 2b In construction   56 Bioswale with Mini Pools 3 In construction
12 Bioretention 2b In construction   57 Tree Box 3 In construction
15 Tree Box 1 Complete   58 Tree Box 3 In construction
16A Swale Curb Extension 2a Complete   59 Tree Box 3 In construction
16B Swale Curb Extension 2a Complete   60 Tree Box 3 In construction
17 Step Pool Storm Conveyance 1 Complete   61 Bioretention 3 In construction
19 Tree Box 1 Complete   62 Parking Pad 3 In construction
20 Tree Box 1 Complete   63 Tree Box 3 In construction
21A Swale Curb Extension 2a Complete   64 Tree Box 3 In construction
21B Swale Curb Extension 2a Complete   65 Bioretention Curb Extension 3 In construction
27 Step Bioretention 2a Complete   66 Swale Curb Extension 3 In construction
28 Step Bioretention 2a Complete   67 Swale Curb Extension 3 In construction

 

Project Schedule and Documents

 

Public Events and Project Schedule
Event Date / Time Location
Initial Public Meeting February 8, 2012 / 7:00 - 8:00 p.m. Sligo Middle School 1401 Dennis Ave. Silver Spring, MD 20910
SFCCA Meeting March 11, 2013 / 7:00 - 8:30 p.m. Schweinhaut Senior Center 1000 Forest Glen Rd. Silver Spring, MD 20901
Construction    
Phase 1 Summer 2012 Completed December 2012 by Angler Environmental
  Phase 2A Spring 2013 Completed October 2013 by Angler Environmental
  Phase 2B Summer 2013 Est. Completion Spring 2014 by Highway Safety Services (HSS). Tree Box practices #1 and #2 have been dropped.
Phase 3 Fall 2013 Starting November 2013 by Meadville Land Services
Phase 2 Community Walk August 8, 2013 / 6:00 - 8:00 p.m.       Start at Lanark Way & Portland Rd. Silver Spring, MD 20901

*Project schedule is tentative and dates are subject to change.

 

Document and Design Plans
February 2012 Meeting Announcement Flyer (PDF, 1.67 MB)
  The Dennis Avenue Green Streets Stormwater Project (PDF, 4.35 MB)
March 2012 Dennis Avenue Green Streets Presentation (PDF, 7.49 MB)
  Dennis Green Streets Exhibit (PDF, 8.42 MB)
April 2013 Dennis Avenue Brochure (PDF, 927 KB)
  Phase 1 & 2 Design-Build Engineering Plans (PDF, 3.43 MB)
  Phase 1 & 2 Redesign (PDF, 7.48 MB)
  Phase 3 Design-Build Engineering Plans (PDF, 2.06 MB)
Dec 2013 Phase 3 Redesign - #53 (PDF, 321 KB)
Jan 2014 Phase 3 Redesign - #56 (PDF, 284 KB)
  Phase 3 Redesign - #51B (PDF, 304 KB)
Feb 2014 Phase 3 Redesign - #51B and 67 (PDF, 403 KB)
  Standard Details for Right-of-Way (PDF, 1.47 MB)
  Walk Flyer (PDF, 730 KB)
  Phase 3 Planting Plan (PDF, 1.83 MB)
  Phase 3 Planting Plan #56 Sinuous Swale (PDF, 674 KB)