Dumont Oaks I Stormwater Pond

As a part of the County's effort to protect our waters, the stormwater pond (Pond - 11157) within the Dumont Oaks community was selected for upgrade to help reduce stormwater pollution draining into our streams.

Various public events will be held through out the project phases for residents to learn about the project and to provide input on the design of the project. Check out the Project Schedule and Documents table at the bottom of the page for more information!

Dumont Oaks I Stormwater Pond

 

PROJECT FACTS
Project Status: In Design
Total Drainage Area: 34.92 Ac
Total Percent Impervious: 32%
Total Stream Project Length: N/A
Estimated Cost: $194,370
Monitoring: No
Watershed: Anacostia River
Contact: Ryan Gardiner
Email:

Ryan.Gardiner@montgomerycountymd.gov

Phone: (240) 499-8531

      

 

 

 

 

 

 

 

 

 

 

 

*Information is subject to change

 

     

    To download, click (PDF, 541KB).

 

Public Events and Project Schedule
Event Date / Time Location
Survey and Site Analysis Spring 2013  
Preliminary Site Assessment Summer 2013  
Public Meeting Spring 2017  
Concept Design Plans Spring 2016  
Community Walk TBD  
Final Plans Summer 2017  
Construction Fall/Winter 2017  

* Project schedule is tentative and dates are subject to change.