Gaywoods Stormwater Pond

As a part of the County's effort in protecting our waters, the stormwater pond (Pond - 11023) within the Gaywoods community was selected for upgrades to help reduce stormwater pollution draining into our streams.

Various public events will be held throughout the project phases for residents to learn about the project and to provide input design of the project. Check out the Public events and project schedule table at the bottom of the page for more information.

                                   

 

PROJECT FACTS
Project Status: In Design
Total Drainage Area: 21.66 Ac
Total Percent Impervious: 20%
Total Stream Project Length: N/A
Estimated Cost: TBD
Monitoring: No
Watershed: Anacostia River
Contact: Brett Long
Email: Brett.Long@montgomerycountymd.gov
Phone: (240) 499-8531

       *Information is subject to change

       Image of Gaywoods Project Map

       To download, click (PDF, 1.46 MB).

 

Public Events and Project Schedule
Event Date / Time Location
Survey and Site Analysis Spring 2013  
Preliminary Site Assessment Summer 2013  
Public Meeting TBD TBD
Concept Design Plans TBD   
Community Walk TBD  TBD
Final Plans TBD   
Construction TBD   

*Project schedule is tentative and dates are subject to change.