Skip Navigation

Germantown Park Stormwater Management and Stream Restoration Project (Phase II)

Project Highlight

As a part of the County's effort in protecting our waters, eight stormwater ponds and a section of the stream within the Germantown Park community were selected for restoration to help reduce stormwater pollution draining into our streams. Four of the eight stormwater ponds and the stream section will be included in this phase of the project. The other four stormwater ponds are part of Germantown Park Stormwater Management and Stream Restoration Project (Phase I).

Various public events will be held through out the project phases for residents to learn about the project and to provide input on the design of the project. Public events and project schedules may vary by site. Click on each site tab on the right for more specific information. 

 

PROJECT FACTS
Project Status: In Design
Total Drainage Area: 34 acres (in addition to Phase I)
Total Percent Impervious: 39%
Total Stream Project Length: 800Ft
Estimate Costs: To be determined
Monitoring: Yes
Watershed: Seneca Creek
Contact: Phil Jones
Email: phil.jones@montgomerycountymd.gov
Phone: (240) 499-8531

 

                                

 

Sites: 11178 - Pond 11111 - Pond 10981 - Pond 10972 - Pond Stream
Site Status: In Design In Design In Design In Design In Design
Site Drainage Area: 15 ac 4.6 ac 5 ac 1.2 ac

7.8 ac

Percent Impervious (%): 33% 48% 39% 62% 40%
Stream Project Length: ---------- ---------- ---------- ---------- 700ft

*Information is subject to change

Image of Germantown Park Phase II

To download, click (PDF, 1.68 MB)

 

Cinnamon Woods - Pond 11178

Image of Asset 11178

 

Public Events and Site Schedule
Event Date / Time Location
Survey and Site Analysis Fall 2013  
Preliminary Site Assessment Summer 2013  
Public Meeting Early 2014 Cinnamon Woods Community Center / 18400 Cinnamon Dr. Germantown, MD 20874
Concept Design Plans Early 2014  
Community Walk Spring 2014 TBD
Final Plans Summer 2014  
Construction Winter 2014  

 

Image of Asset 11178

To download, click (PDF, 286 KB)

 

Cinnamon Woods - Pond 11111

Image of Asset 11111

 

Public Events and Site Schedule
Event Date / Time Location
Survey and Site Analysis Fall 2013  
Preliminary Site Assessment Summer 2013  
Public Meeting Early 2014 Cinnamon Woods Community Center / 18400 Cinnamon Dr. Germantown, MD 20874
Concept Design Plans Early 2014  
Community Walk Spring 2014 TBD
Final Plans Summer 2014  
Construction Winter 2014  

 

Image of Asset 11111

To download, click (PDF, 267 KB)

 

Cinnamon Woods - Pond 10981

Image of Asset 10981

 

Public Events and Site Schedule
Event Date / Time Location
Survey and Site Analysis Fall 2013  
Preliminary Site Assessment Summer 2013  
Public Meeting Early 2014 Cinnamon Woods Community Center / 18400 Cinnamon Dr. Germantown, MD 20874
Concept Design Plans Early 2014  
Community Walk Spring 2014 TBD
Final Plans Summer 2014  
Construction Winter 2014  

 

Image of Asset 10981

To download click, (PDF, 269 KB)

 

Cinnamon Woods - Pond 10972

Image of Asset 10972

 

Public Events and Site Schedule
Event Date / Time Location
Survey and Site Analysis Fall 2013  
Preliminary Site Assessment Summer 2013  
Public Meeting Early 2014 Cinnamon Woods Community Center / 18400 Cinnamon Dr. Germantown, MD 20874
Concept Design Plans Early 2014  
Community Walk Spring 2014 TBD
Final Plans Summer 2014  
Construction Winter 2014  

 

Image of Asset 10972

To download, click (PDF, 256 KB)

 

Germantown Park Stream Restoration

Image of Germantown Park Stream

 

 

The 800ft stream section between Cinnamon Woods HOA Stormwater Pond - 11161 and Cinnamon Woods HOA Stormwater Pond - 11178 was selected to address unstable stream banks and promote aquatic animals in the stream. After the project is completed, the stream will be monitored to evaluate success of project goals.

 

 

 

Public Events and Site Schedule
Event Date / Time Location
Survey and Site Analysis Spring 2013  
Preliminary Site Assessment Summer 2013  
Public Meeting Summer 2013 TBD
Concept Design Plans Fall 2013  
Community Walk Winter 2013 TBD
Final Plans Spring 2014  
Construction Fall 2014  
Monitoring Post Construction  

 

Image of Cinnamon Woods Stream

To download, click (PDF, 363 KB)