Skip Navigation

Stewartown Homes and Partridge Place Stormwater Pond Upgrades

As a part of the county's effort in protecting our waters, two stormwater ponds within the Stewartown Homes and Partridge Place communities were selected for restoration to help reduce stormwater pollution draining into our streams. 

Various public events will be held through out the project phases for residents to learn about the project and to provide input on the design of the project. Public events and project schedule may vary by site. Click on each site tabs on the right for more specific information.

 

                              

 

Project Facts
Project Status: In Design
Total Drainage Area: 70.7 Ac
Total Percent Impervious: 29%
Total Stream Project Length: N/A
Estimated Cost: TBD
Monitoring: No
Watershed: Seneca Creek
Contact: Ryan Gardiner
Email: Ryan.Gardiner@montgomerycountymd.gov
Phone: (240) 499-8531

    *Information is subject to change

    Image of Stewartown Homes and Patridge Place

    To download, click (PDF, 2.18 MB)

 

Sites: Stewartown Homes Pond Partridge Place Pond
Site Status:  In Design In Design
Site Drainage Area: 70.7 46.6
Percent Impervious (%): 29% 24%
Stream Project Length: ---------- ----------

*Information is subject to change

 

Stewartown Homes Stormwater Pond

 

Image of Stewartown Homes Stormwater Pond

Stewartown Pond is located North of Merust Lane.

 

Public Events and Site Schedule
Event Date / Time Location
Survey and Site Analysis Spring 2014  
Preliminary Site Assessment Spring 2014  
Public Meeting TBD TBD
Concept Design Plans Spring 2014  
Community Walk TBD TBD
Final Plans Fall 2014  
Construction Fall 2015  

*Project Schedule is tentative and dates are subject to change.

 

Image of Stewartown Pond

To download, click (PDF, 517 KB)

 

Patridge Place Stormwater Pond

 

Image of Patridge Place Stormwater Pond

Pond is adjacent to Bazzellton Place.

 

Public Events and Site Schedule
Event Date / Time Location
Survey and Site Analysis Spring 2014  
Preliminary Site Assessment Spring 2014  
Public Meeting TBD TBD
Concept Design Plans Spring 2014  
Community Walk TBD TBD
Final Plans Fall 2014  
Construction Fall 2015  

*Project schedule is tentative and dates are subject to change.

 

Image of Patridge Place Stormwater Pond