Strathmore Elementary School Stormwater Practice Upgrades

As a part of the County’s effort to protect our waters, Strathmore Elementary School was selected for a county facilities project to help reduce stormwater pollution that drains into our streams. County Facilities projects generally involve installing small-scale stormwater practices to capture water from rooftops, roadways, and sidewalks during storms. County Facilities projects incorporate many of the same practices as Green Streets projects.

Residents surrounding the Strathmore Elementary School project area can also help reduce stormwater pollution by installing stormwater practices on their property through the County's Targeted RainScapes Neighborhood program.

Various public events will be held throughout the project phases for staff, students and parents to learn about the project and to provide input on the design of the project.  Go to the “Project Schedule and Documents” tab for more information on public events and project schedules. 



Project Status: In Design
Total Drainage Area: 2.96 Ac.
Total Percent Impervious: 45%
Total Stream Project Length: N/A
Estimated Cost: $211,000
Monitoring: No
Watershed: Rock Creek
Contact: Catherine Eichel
Phone: (240) 499-8531

     *Information are subjected to change


      Image of Strathmore Elementary School 


Project Schedule and Documents


Public Events and Site Schedule
Event Date\Time Location

Survey and Site Analysis

Completed Fall 2013


Preliminary Site Assessment

Completed Fall 2013


Public Meeting

If needed


Concept Design Plans

Completed Fall 2014


Site Walk

If needed


Final Plans 

Summer 2015



Summer 2016