Building Design and Construction

Davis Library Refresh

Montgomery County Government
Department of General Services

Project Manager
Gary Colton
(240) 777-6119
Section Chief Studio #1
Frank Roberts
(240) 777-6084





Funding/Expenditure Schedule: APPROVED


Architect
NOA Architecture Planning Interiors
7925 Glenbrook Rd # 9C,
Bethesda, MD 20854
301-951-7933
Contractor
Haris Design and Construction
12410 Milestone Center Dr #175,
Germantown, MD 20876
301-294-6390
 

Notices

Current Phase: Construction

The Davis library is scheduled to reopen to the public on Saturday April 8, 2017. The renovations for the project include new circulation and information desks, new carpet / flooring, and paint, addition of two collaboration rooms, ADA renovations to the public restrooms on the main and lower levels, cafĂ© seating area on lower level, reorganization of shelving in the adult and children’s reading room, and the replacement of furniture in the adult and children’s reading room areas, new bi-level water fountains, and a new front entrance display cabinet. The exterior canopy and the benches at the front entrance have also been renovated. The library sign along Democracy Boulevard now has lighting.

The existing building was refreshed on its interior to provide new checkout and information desks, new paint and floor finishes throughout the building, the addition of two collaboration spaces, renovations to the public restrooms on the main and lower levels, reorganization of shelving in the adult and children’s reading room, and the replacement of furniture in the adult and children’s reading room areas. New lighting was also provided to the library sign facing Democracy Boulevard.

LIBRARY DESIGN & FEATURES ADDED:

  • New Information and Checkout Customer desks
  • Enhanced Children's area
  • Teen space with seating and collection
  • Collaboration Spaces
  • ADA upgrade of public restrooms on main and lower levels
  • New furniture, including new tables in the teen area and adult reading room
  • New lighting for library’s outdoor sign
  • Additional powered work areas
  • New vending machines and seating area in lower level
  • Improvements to large and small meeting rooms
  • Laptop lane
  • Drinking fountain with bottle filling station


Project Images

After

 

 

 

 

Before

 

 

 

 
 
 
 