Multi-Agency Service Park (MASP) & Public Safety Training Academy (PSTA) - Project 2: MCPS Food Distribution Relocation

Back to: OSP HomeNeighborhood ProjectsUp-County ProjectsMASP & PSTA › Project 2: MCPS Food Distribution Relocation

Show the project location in google map8401 Snouffer School Road
Gaithersburg, MD 20879

MASP & PSTA - Overall Site Map

Funding/Expenditure Schedule

 

Project Team

Architect
Baker and Associates
3601 Eisenhower Ave. 6th Floor
Alexandria, VA 22304
Contractor
Costello Construction of Maryland, Inc.
10211 Wincopin Circle, Suite #100
Columbia, MD 21044
 

Montgomery County Government
Department of General Services

Office of Special Projects
Hamid Omidvar, AIA, Chief
240-777-6126
Project Manager
Ali Davoodi, RA
240-777-6009
Team Leader
Name
Phone #
 

The Montgomery County Multi Agency Service Park (MASP) & Public Safety Training Academy (PSTA) includes 4 projects:

This project is completed.

Project Status and Schedule:

Design Start: 9/1/2012
Construction Start: 10/1/2013
Construction Completed: 1/15/2015

The Ribbon Cutting Ceremony: 01/12/2015

Tenant:

Montgomery County Public Schools, Division of Food and Nutrition Services (MCPS-DFNS)

2A-Food Distribution Facility: (77,470 GSF, Building Height, one Story, 35’)

The Food facility is a one story structure consisting steel structure and concrete masonry exterior walls used as load bearing walls. The majority of the building is a one story warehouse type space, with a portion of the building on the east side having an intermediate second floor level for administrative spaces. Roof framing at the warehouse portion is long span open web steel joists supported by steel beams that span between interior steel columns and exterior load bearing concrete masonry walls. The exterior of the building is finished with multi-color and variegated face masonry veneer. The intermediate second floor level consists of a concrete slab on composite metal deck. The slab is supported by a system of steel beams and girders designed to act compositely with the slab. Floor structure is supported by steel columns. The building roof membrane is topped with a green roof in support of storm water management plan for the entire site. The building will house MCPS food preparation, distribution and related administrative functions.

2B-Parking:

A 4 story precast parking garage is planned for the Food Facility and Maintenance Depot.

Surface Parking: 25 spaces
Garage Parking: 4 level garage, 450 spaces, 160,781 GSF

Central Utility Plant:

The central plant will be accommodated in the basement of the Parking garage with an access ramp directly from the Parking entrance. The ramp will provide parking spaces. A total area of approximately13,900 SF will be utilized in the basement for this purpose.

Links of Interest:

Smart Growth Initiative

Change to Slide Show view. Click an image to view in full size.

Depot Garage 3rd Floor

MASP & PSTA Project 2: MCPS Food Distribution Relocation - Depot Garage 3rd Floor

Depot Garage 4th Floor

MASP & PSTA Project 2: MCPS Food Distribution Relocation - Depot Garage 4th Floor

Exterior View / Depot Garage

MASP & PSTA Project 2: MCPS Food Distribution Relocation - Exterior View / Depot Garage

Exterior View/ Depot Garage

MASP & PSTA Project 2: MCPS Food Distribution Relocation - Exterior View/ Depot Garage

Food Distribution Facility- 1st Floor

MASP & PSTA Project 2: MCPS Food Distribution Relocation - Food Distribution Facility- 1st Floor

Food Distribution Facility- 2nd Floor

MASP & PSTA Project 2: MCPS Food Distribution Relocation - Food Distribution Facility- 2nd Floor

Exterior View Of MCPS Food Distribution Facility

MASP & PSTA Project 2: MCPS Food Distribution Relocation - Exterior View Of MCPS Food Distribution Facility

Exterior View Of MCPS Food Distribution Facility

MASP & PSTA Project 2: MCPS Food Distribution Relocation - Exterior View Of MCPS Food Distribution Facility

Exterior View Of MCPS Food Distribution Facility

MASP & PSTA Project 2: MCPS Food Distribution Relocation - Exterior View Of MCPS Food Distribution Facility

Exterior View Of MCPS Food Distribution Facility

MASP & PSTA Project 2: MCPS Food Distribution Relocation - Exterior View Of MCPS Food Distribution Facility
MASP - construction picture 1
MASP - construction picture 1
MASP - construction picture 1
MASP - construction picture 1
MASP - construction picture 1
MASP - construction picture 1