Needwood Road Bike Path Phase I

The Phase I provides an eight feet wide shared use path along the south side of Needwood Road over approximately 2,400 feet of length from the beginning of Nature Trail, west of Lake Needwood to the ICC Trail terminus. This project is approved for $860,000 from Maryland Department of Transportation for design and construction for Phase I of the project.

The construction for Phase I started in June 2016 with ten months of duration.

Shirley Reeves-Collette, Area Engineer
Montgomery County Department of Transportation
Division of Transportation Engineering
100 Edison Park Drive, 4th Floor
Gaithersburg, Maryland 20878
Phone: 240-773-3412
E-mail: shirley.reeves-collette@montgomerycountymd.gov

Needwood Road Bike Path Phase I
Area Map
  • Limit of Disturbance Staked out for Trail

    Limit of Disturbance Staked out for Trail

  • Excavation for the Trail

    Excavation for the Trail

  • Compacting Soil for Trail

    Compacting Soil for Trail

  • Laying Out Graded Aggregate Base followed by Asphalt Base

    Laying Out Graded Aggregate Base followed by Asphalt Base