Gaithersburg East Page

This page lists the currently scheduled projects for the 2021 Construction Season in the Gaithersburg East Depot service area. Click on the Neighborhood or Location name (if underlined) to read or download a Project Newsletter describing the scope of the project. Check back periodically as projects get added or scheduled. This schedule may be changed and substitutions may be made at any time due to weather and/or operational reasons.

Updated: June 21, 2021

Project Location Project Scope Estimated Start Date Status
Crabbs Branch Way Slurry/Micro Resurfacing Summer 2021  
Germantown Road Slurry/Micro Resurfacing Summer 2021  
Thistlebridge Concrete Repair/Replacement Summer 2021 5%