Silver Spring Depot Page

This page lists the currently scheduled projects for the 2021 construction season in the Silver Spring Depot Depot service area. Click on any linked Neighborhood or Location name to read or download a Project Newsletter describing the scope of the project. Check back periodically as projects get added or scheduled. This schedule may be changed and substitutions may be made at any time due to weather and/or operational reasons.

Updated: June 16, 2021

Project Location Project Scope Estimated Start Date Status
Bel Pre Woods Phase III Residential Resurfacing Summer 2020 80%
Connecticut Avenue Hills Residential Resurfacing Summer 2021  
Dennis Avenue Slurry/Micro Resurfacing Summer 2021  
Elkhart Street Residential Rehabilitation Summer 2021  
Greenwood Knolls Phase III Residential Resurfacing Summer 2021  
Plyers Mill Road Slurry/Micro Resurfacing Summer 2021  
Rolling Terrace Concrete Replacement Summer 2020 60%
Sligo Creek Parkway Slurry/Micro Resurfacing Summer 2021