2009 CONSTRUCTION SEASON:

 
Street Name From: To: Start Date Status
Denfield Rd Wexford Dr Connecticut Ave 5/18/2009 Complete
Decatur Ave Wexford Dr Connecticut Ave 5/18/2009 Complete
Lawrence Ave Decatur Ave Connecticut Ave 5/18/2010 Complete
Crystal Rock DR Germantown Rd E.O.M. 6/1/2009 Complete
Calverton Blvd Cherry Hill Rd  Galway Dr (PG County Line) 6/1/2009 Complete
Father Hurley Blvd Wisteria Dr Crystal Rock Dr 6/1/2009 Complete
Wisteria Dr Germantown Rd Father Hurley Blvd 6/1/2009 Complete
Wisteria Dr Ph 2 Father Hurley Blvd Sea Breeze Ct. 9/8/2009 60% Complete
Bel Pre Rd Georgia Ave Layhill Rd 6/29/2009 Complete
Amherst Ave Windham Lane Arcola Ave 7/20/2009 Complete
Nicholson La Rockville Pike Old Georgetown Rd 7/3/2009 Complete
Huntington Pkwy Bradley Blvd Old Georgetown Rd 8/17/2009 Complete
Seven Locks Rd Democracy Blvd Bradley Blvd May 2010 Scheduled
Gainsbourgh Rd Tuckerman La Democracy Blvd 9/7/2009 Scheduled
Travilah Rd RT.28 Dufief Mill Rd TBD Scheduled
Grosvenor La Cheshire Dr Rockville Pike Sept 2009 Complete
Fenton  St Wayne Ave Philadelphia Ave TBD Scheduled
  Proposed Night Work
This schedule may be changed and substitutions may be made at any time due to weather or operational reasons.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 