As a part of the County's effort to protect our waters, eight stormwater ponds and a section of stream within the Germantown Park community were selected for restoration to help reduce stormwater pollution draining into our streams. Four of the eight stormwater ponds and the stream section will be included in this phase of the project. The other four stormwater ponds are part of Germantown Park Stormwater Management and Stream Restoration Project (Phase I).

Various public events will be held throughout the project phases for residents to learn about the project and to provide input on the design of the project. Public events and project schedules may vary by site. Click on each site tab on the right for more specific information.

Germantown Park Stormwater Facility Retrofits - Phase II

 

PROJECT FACTS
Project Status: In Design
Total Drainage Area to Ponds: 26 acres
Total Percent Impervious to Ponds: 33%
Total Drainage Area to Stream: 36.3 acres (includes upstream pond)
Total Percent Impervious to Stream: 40%
Total Stream Project Length: 800 ft
Estimated Cost: $1.1 million
Monitoring: Yes
Watershed: Seneca Creek (Gunners Branch Tributary)
Contact: Doug Marshall
Email: Douglas.Marshall@montgomerycountymd.gov
Phone: (240) 777-7767

Germantown Park Stormwater Facility Retrofits Factsheet (PDF, 464 KB)

 

Sites: 11178 - Pond 11111 - Pond 10981 - Pond 10972 - Pond Stream
Site Status: In Design In Design In Design In Design In Design
Site Drainage Area: 15 ac 4.6 ac 5 ac 1.3 ac

36.3 ac

Percent Impervious (%): 26% 48% 39% 53% 40%
Stream Project Length: ---------- ---------- ---------- ---------- 800ft

*Information is subject to change

 

 

To download, click (PDF, 1.68 MB)

 

Germantown Park - Pond 11178

Stormwater Pond 11178 is located between Tarragon Way and Bay Leaf Way.

Image of Asset 11178

 

Public Events and Site Schedule
Event Date / Time Location
Survey and Site Analysis Summer 2013  
Preliminary Site Assessment Summer 2013  
Public Meeting September 17, 2015 / 7:30 pm

Germantown Park Community Center / 18400 Cinnamon Dr. Germantown, MD 20874

Public Meeting Flyer PDF(246KB)

Concept Design Plans Summer 2014  
Community Walk TBD TBD
Final Plans Spring 2016  
Construction Spring 2017  

 

Image of Asset 11178

To download, click (PDF, 286 KB)

 

Germantown Park - Pond 11111

Stormwater Pond 11111 is located south of Bay Leaf Way and north of the Germantown Park community center and pool.

 

Image of Asset 11111

 

Public Events and Site Schedule
Event Date / Time Location
Survey and Site Analysis Summer 2013  
Preliminary Site Assessment Summer 2013  
Public Meeting September 17, 2015 / 7:30 pm

Germantown Park Community Center / 18400 Cinnamon Dr. Germantown, MD 20874

Public Meeting Flyer PDF(246KB)

Concept Design Plans Summer 2014  
Community Walk TBD TBD
Final Plans Spring 2016  
Construction Fall 2016- Spring 2017  

 

Image of Asset 11111

To download, click (PDF, 267 KB)

 

Germantown Park - Pond 10981

Stormwater Pond 10981 is located east of Sesame Seed Ct and Pumpkin Seed Ct, in Gunners Branch Local Park.

 

Image of Asset 10981

 

Public Events and Site Schedule
Event Date / Time Location
Survey and Site Analysis Summer 2013  
Preliminary Site Assessment Summer 2013  
Public Meeting September 17, 2015 / 7:30 pm

Germantown Park Community Center / 18400 Cinnamon Dr. Germantown, MD 20874

Public Meeting Flyer PDF(246KB)

Concept Design Plans Summer 2014  
Community Walk TBD TBD
Final Plans Spring 2016  
Construction Fall 2016 - Spring 2017  

 

Image of Asset 10981

To download click, (PDF, 269 KB)

 

Germantown Park - Pond 10972

Stormwater Pond 10972 is located west of Cinnamon Drive and south of the Germantown Park community center and pool.

 

Image of Asset 10972

 

Public Events and Site Schedule
Event Date / Time Location
Survey and Site Analysis Summer 2013  
Preliminary Site Assessment Summer 2013  
Public Meeting September 17, 2015 / 7:30 pm

Germantown Park Community Center / 18400 Cinnamon Dr. Germantown, MD 20874

Public Meeting Flyer PDF(246KB)

Concept Design Plans Summer 2014  
Community Walk TBD TBD
Final Plans Spring 2016  
Construction Fall 2016 - Spring 2017  

 

Image of Asset 10972

To download, click (PDF, 256 KB)

 

Germantown Park Stream Restoration

The 800ft stream section between Stormwater Pond 11161(Phase I) and Stormwater Pond 11178(Phase II) was selected to address unstable stream banks and promote aquatic habitat. After the project is completed, the stream will be monitored to evaluate success of project goals.

 

Image of Germantown Park Stream

 

Public Events and Site Schedule
Event Date / Time Location
Survey and Site Analysis Summer 2013  
Preliminary Site Assessment Summer 2013  
Public Meeting September 17, 2015 / 7:30 pm

Germantown Park Community Center / 18400 Cinnamon Dr. Germantown, MD 20874

Public Meeting Flyer PDF(246KB)

Concept Design Plans Fall 2014  
Community Walk TBD TBD
Final Plans Summer 2016  
Construction Spring 2017  
Monitoring Post Construction  

 