White Oak Middle School Stormwater Practice Upgrades

As a part of the County’s effort to protect our waters, White Oak Middle School was selected for a county facilities project to help reduce stormwater pollution that drains into our streams. County Facilities projects generally involve installing small-scale stormwater practices to capture water from rooftops, roadways, and sidewalks during storms. County Facilities projects incorporate many of the same practices as Green Streets projects.

Residents surrounding the White Oak Middle School project area can also help reduce stormwater pollution by installing stormwater practices on their property through the County's Targeted RainScapes Neighborhood program.

Various public events will be held throughout the project phases for staff, students and parents to learn about the project and to provide input on the design of the project.  Go to the “Project Schedule and Documents” tab for more information on public events and project schedules. 

 

 

PROJECT FACTS
Project Status: In Design
Total Drainage Area: 3.55 Ac.
Total Percent Impervious: 62%
Total Stream Project Length: N/A
Estimated Cost: $499,000
Monitoring: No
Watershed: Anacostia
Contact: Catherine Eichel
Email: Catherine.Eichel@montgomerycountymd.gov
Phone: (240) 499-8531

     *Information is subject to change

 

     Image of White Oak Middle School 

 

Project Schedule and Documents

 

Public Events and Site Schedule
Event Date\Time Location

Survey and Site Analysis

Completed Summer 2013

 

Preliminary Site Assessment

Completed Fall 2013

 

Public Meeting

If needed

TBD

Concept Design Plans

Completed Fall 2014

 

Site Walk

If needed

TBD

Final Plans 

Summer 2015

 

Construction 

Summer 2015