Brigadier General Charles E. McGee Library

Special Notice: Place Holder for special notice

Notice: Project Completed

Show the project location in google map 900 Wayne Ave, Silver Spring, MD 20910

Potomac Library Refurbishment

Funding/Expenditure Schedule: APPROVED

Project Team

Montgomery County Government
Department of General Services

Division of Building Design & Construction

Division Chief: Hamid Omidvar, AIA
[email protected]
Section Chief: Ali Davoodi
Project Manager: Gary Colton

Architect / Engineer

Sheladia Associates, Inc.

Contractor

TBD.

For operations inquiries. Please contact.

Montgomery County Public Libraries

Current Phase: Design

Project Schedule:

Phase 1 - Parking Spaces Repair
Construction commenced on April 23,2018
Construction completed September 2019
Phase 2 - Stair Towers Renovation
Construction commenced on September 23, 2019
Construction will be completed August 2021

Sheladia Associates, Inc. submitted the bid documents and the design is complete. The building permit is on hold. Construction is scheduled for July 1, 2026.

Live Project Video

Ribbon Cutting Ceremony

Event Images

Event Images

Event Image

Sheladia and Associates has designed the McGee Library Refurbishment in accordance with the Program of Requirements previously developed for the library.
The Program of Requirements called for replacing the exterior sliding doors with swing out doors, replacing the vinyl flooring and carpeting, exchanging the children's play area and stacks to reduce the noise in the 4th floor meeting rooms along with adding a ceiling in the meeting rooms, replacing defective windowblinds, adjusting the slope of the glass canopy over the cafe entrance to better drain, replacing damaged and dirty furniture, installing 3 new service desks (oneon each floor), new water fountains with bottle filling stations, repairing walls, adding corner guards and repainting.
In a separate project, interior window film was added in the rotunda and south walls in December of 2024.

Architectural and Construction Images

NEW STOREFRONT ENTRANCES

Pavilion - South Glass

NEW FAMILY RESTROOM

FACADES OF McGEE LIBRARY TO GET WINDOW FILM INSTALLED

NEW CHILDREN’S NOOK

WINDOW FILM INSTALLATION ON THE 3RD FLOOR, McGEE LIBRARY

NEW QUIET STUDY ROOM

WINDOW FILM INSTALLATION ON 4TH FLOOR OF McGEE LIBRARY

CAFÉ STYLE SEATING IN ADULT AREA

INSTALLATION OF WINDOW FILM: BEFORE AND AFTER

NOOK STYLE SEATING IN ADULT AREA

SCAFFOLING IN PAVILION OF McGEE LIBRARY

NEW TEEN AREA

SCAFFOLDING IN PAVILION OF McGEE LIBRARY

NEW SEATING IN MAIN AREA

INSTALLATION OF WINDOW FILM IN PAVILION OF McGEE LIBRARY

NEW STEEL RAILING

NEW STEEL RAILING

STAFF AREA READY FOR NEW MILLWORK

STAFF AREA READY FOR NEW MILLWORK

NEW RAILING ON REAR WALL

NEW RAILING ON REAR WALL

BRICK WALL REPOINTING / REPAIRS (PRE-CLEANING)

BRICK WALL REPOINTING / REPAIRS (PRE-CLEANING)

INITIAL ROOF SPOT REPAIRS

INITIAL ROOF SPOT REPAIRS

INSTALLATION OF NEW ROOF OVERFLOW DRAIN

INSTALLATION OF NEW ROOF OVERFLOW DRAIN

NEW BOLLARDS TO PROTECT LIGHT POLES

NEW BOLLARDS TO PROTECT LIGHT POLES

INSTALLATION OF NEW PVC SEWER PIPE IN STAFF AREA

INSTALLATION OF NEW PVC SEWER PIPE IN STAFF AREA

INSTALLATION OF NEW STEEL FRAMING FOR WALLS IN LIBRARY

INSTALLATION OF NEW STEEL FRAMING FOR WALLS IN LIBRARY

Architectural and Construction Images

Reception/Admin. & Staff Work Area 142 & 142A

Main Lobby 101

Kitchen Renovation - download Final Design

Existing Kitchen

New Kitchen Design

Architectural and Construction Image

TBD