The project is divided into two phases. Phase I provides an 8-foot wide impervious shared use path over approximately 3,400 feet of length along the south side of Needwood Road from 55 feet east to the intersection with Equestrian Lane to the west terminus of the ICC shared use path. Phase II provides a combination of 8-foot wide pervious and impervious shared use path over approximately 5,000 feet of length along the south side of Needwood Road from the western intersection with Deer Lake Road to 55 feet east to the intersection with Equestrian Lane. Phase II continues with an 8-foot wide shared use path over approximately 900 feet of length along the south side of Needwood Road from the east terminus of the ICC shared use path to Muncaster Mill Road. In addition, Phase II provides a 6-foot wide sidewalk over approximately 800 feet of length along the east side of Muncaster Mill Road from the intersection with Needwood Road to the northern entrance of Colonel Zadok Magruder High School.
Montgomery County Department of Transportation Division of Transportation Engineering 100 Edison Park Drive, 4th Floor Gaithersburg, Maryland 20878 Phone: 240-777-7220 Fax: 240-777-7277 E-mail: [email protected]
Tweets about #NeedwoodSW from:MoCo_DTE