Gaithersburg East Page
This page lists the currently scheduled projects for the 2021 Construction Season in the Gaithersburg East Depot service area. Click on the Neighborhood or Location name (if underlined) to read or download a Project Newsletter describing the scope of the project. Check back periodically as projects get added or scheduled. This schedule may be changed and substitutions may be made at any time due to weather and/or operational reasons.
Updated: June 21, 2021
Project Location | Project Scope | Estimated Start Date | Status |
---|---|---|---|
Crabbs Branch Way | Slurry/Micro Resurfacing | Summer 2021 | |
Germantown Road | Slurry/Micro Resurfacing | Summer 2021 | |
Thistlebridge | Concrete Repair/Replacement | Summer 2021 | 5% |