Silver Spring Depot Page
This page lists the currently scheduled projects for the 2021 construction season in the Silver Spring Depot Depot service area. Click on any linked Neighborhood or Location name to read or download a Project Newsletter describing the scope of the project. Check back periodically as projects get added or scheduled. This schedule may be changed and substitutions may be made at any time due to weather and/or operational reasons.
Updated: June 16, 2021
Project Location | Project Scope | Estimated Start Date | Status |
---|---|---|---|
Bel Pre Woods Phase III | Residential Resurfacing | Summer 2020 | 80% |
Connecticut Avenue Hills | Residential Resurfacing | Summer 2021 | |
Dennis Avenue | Slurry/Micro Resurfacing | Summer 2021 | |
Elkhart Street | Residential Rehabilitation | Summer 2021 | |
Greenwood Knolls Phase III | Residential Resurfacing | Summer 2021 | |
Plyers Mill Road | Slurry/Micro Resurfacing | Summer 2021 | |
Rolling Terrace | Concrete Replacement | Summer 2020 | 60% |
Sligo Creek Parkway | Slurry/Micro Resurfacing | Summer 2021 |