This project proposes a 5-foot-wide concrete sidewalk on the east side (odd-numbered properties) of Rippling Brook Drive from Bel Pre Road to the existing sidewalks. With a priority rating of 94.5 out of 100, this is a high-priority installation to tie existing sidewalks together and enhance pedestrian safety. Please see the Sidewalk Program’s Frequently Asked Questions (FAQ) to learn more about the Sidewalk Program and how its priority ratings are generated.
A sidewalk proposal is being issued for questions and comments to those residing adjacent to the potentially impacted public right-of-way and those neighboring across the street. A public hearing may be required as part of the final decision-making process. The deadline for comments is Wednesday, March 25, 2026, at 5:00 p.m.
Annual Sidewalk Program Montgomery County Department of Transportation Division of Transportation Engineering 100 Edison Park Drive, 4th Floor Gaithersburg, Maryland 20878 [email protected] Robert Gonzales - Sidewalk Section Chief 240-777-7296 [email protected] Juan Berrios - Field Supervisor 240-777-7278 [email protected] Daniel Hagos Kamara - Construction Representative 240-777-7926 [email protected] Lori Jean Main - Planning Specialist 240-777-7271 [email protected] Please be sure to include your name and property address on all email correspondence.