Tucker Lane Construction Project

The project includes replacement of an existing pipe culvert with twin 7’ W x 6’ H box culvert including wingwalls. Work will include maintenance of traffic, erosion and sediment control, stream stabilization & protection and grade control structures, guardrail, Tree removal and planting and bridge approach pavement work.

Tucker Lane: Downstream View
Tucker Lane
Tucker Lane: Upstream View
  • The construction of Tucker Lane Culvert replacement will begin on or about Thursday, February 9, 2023. The road will be closed only at the culvert area during construction and a convenient detour will be implemented. See Detour map in 'Project Documents'.
  • The road will be closed at construction area. Detour signs and Variable Message Sign Board (VMS) will be placed on MD 108, MD 650, Spring Road and Tucker Lane.

Project Documents

Montgomery County Department of Transportation
Division of Transportation Engineering
100 Edison Park Drive, 4th Floor
Gaithersburg, Maryland 20878

Michelle Haley, Area Engineer
[email protected]
240-278-2292

Hussain Dilshad, Construction Representative
[email protected]
240-876-7970

Area Map