The project includes replacement of an existing pipe culvert with twin 7’ W x 6’ H box culvert including wingwalls. Work will include maintenance of traffic, erosion and sediment control, stream stabilization & protection and grade control structures, guardrail, Tree removal and planting and bridge approach pavement work.
Montgomery County Department of Transportation Division of Transportation Engineering 100 Edison Park Drive, 4th Floor Gaithersburg, Maryland 20878
Michelle Haley, Area Engineer [email protected] 240-278-2292
Hussain Dilshad, Construction Representative [email protected] 240-876-7970