The project will construct a contraflow separated bike lane on the east side of Glenbrook Road from Bradley Blvd. to Fairfax Dr. Traffic calming islands are also included in the design as a means of reducing speeds. Concept 3 (Sidewalk with Northbound Bike Lane) was selected as the recommended design.
Construction completed in December 2016.
Patricia Shepherd, A.I.C.P. Capital Projects Manager/Bikeways Coordinator Division of Transportation Engineering 100 Edison Park Dr., 4th Floor Gaithersburg, MD 20878 E-mail: patricia.shepherd@montgomerycountymd.gov Phone: 240-777-7231
Before Construction - Glenbrook Rd.
During Construction - Glenbrook Rd.
During Construction - Glenbrook Rd. - Flex posts are being installed
After Construction - Glenbrook Rd. looking North