Lutes-Briggs Community Sidewalk Proposal

The Lutes-Briggs Sidewalk Project proposed the installation of a 5-foot-wide, ADA-compliant, concrete sidewalk along the following roadways in Silver Spring:

  • the North side of Briggs Road from the existing sidewalk to Lutes Lane;
  • the West side of Lutes Drive from Briggs Road to Mumford Drive;
  • the West side of Wilton Oaks Drive from Briggs Road to Mumford Drive;
  • the East side of Ewood Lane from Briggs Road to Victor Court;
  • the West side of Ideal Drive from Briggs Road to Victor Court;
  • the South side of Victor Court from Ewood Lane to Ideal Drive;
  • the West side of Disney Lane from Briggs Road to the end of Disney Lane

Project Schedule

The Lutes-Briggs Sidewalk Proposal was issued to residents for comment on September 3, 2019 and was the subject of a Public Hearing on June 17, 2020. On September 3, 2020, the Hearing Officer’s Recommendations approving the sidewalk installation was signed by Director, Christopher Conklin.

To view a recording of the public hearing, please click on the link: https://montgomerycounty.adobeconnect.com/pha9dmo3q0uv/

Construction of the Lutes-Briggs Community Sidewalk Project is scheduled for the Spring or Summer of 2021.

Annual Sidewalk Program
Division of Transportation Engineering
100 Edison Park Drive, 4th FL
Gaithersburg, Maryland 20878
[email protected]

Robert Gonzales, Manager
[email protected]
240-777-7296
Geary “Rick” Holley, Field Supervisor
[email protected]
240-777-7273
Juan Berrios, Construction Representative
[email protected]
240-777-7278
Lori Jean Main, Planning Specialist
[email protected]
240-777-7271

Please note that due to COVID-19, we are currently teleworking. Our phones are operational and we welcome any questions or comments you may have. Stay safe and well!

Thank You!

Area Map