Highway Services         

Gaithersburg East Page

This page lists the currently scheduled projects for the 2019 Construction Season in the Gaithersburg East Depot service area. Click on the Neighborhood or Location name (if underlined) to read or download a Project Newsletter describing the scope of the project. Check back periodically as projects get added or scheduled. This schedule may be changed and substitutions may be made at any time due to weather and/or operational reasons.

Updated: July 11, 2019

Project Location Project Scope Estimated Start Date Status
Derwood Station Micro Resurfacing Summer 2019  
Goshen Estates Micro Resurfacing Summer 2019  
Mill Run Drive Micro Resurfacing Summer 2019  
Park Mill Drive Micro Resurfacing Summer 2019  
Seneca Crossing Drive Micro Resurfacing Summer 2019  

 