This page lists the currently scheduled projects for the 2019 Construction Season in the Colesville Depot service area. Click on any linked Neighborhood or Location name to read or download a Project Newsletter describing the scope of the project. Check back periodically as projects get added or scheduled. This schedule may be changed and substitutions may be made at any time due to weather and/or operational reasons.

Updated: July 11, 2019

Project Location Project Scope Estimated Start Date Status
Fairland Farm Residential Hot Mix Asphalt Paving Summer 2019  
Hewitt Avenue Micro Resurfacing Summer 2019  
Peach Orchard Road Primary Resurfacing Summer 2019  
Regina Drive Concrete  Summer 2019  
Rippling Brook Drive Micro Resurfacing Summer 2019  
Springbrook Village Micro Resurfacing Summer 2019  
Sunnymeade Permanent Patching Spring 2019  