Hollywood Branch Stream Restoration

 

As a part of the County's effort to help reduce stormwater pollution that drains into our streams and enhance aquatic habitat, the County is collaborating with the Maryland-National Park and Planning Commission (M-NCPPC), to restore approximately 4,470 feet of the Hollywood Branch, from Midland Rd. down to Cannon Rd. Construction on the upper Hollywood Branch stream restoration project was completed during the Spring/Summer of 2014. The second half of the project will be completed during the Spring/Summer of 2015.

This project is also adjacent to the Cannon Road Green Streets project which includes the Carole Acres, Buckly Downs, and Woodlawn Terrace area. Green Street projects generally involve installing small-scale stormwater practices within the County's right-of-way to capture water from roadways and sidewalks during storms.

The State Highway Administration (SHA) is restoring the lower section of Hollywood Branch below Cannon Rd. to the confluence with the Paint Branch as part of their environmental stewardship and mitigation for the Inter County Connector (ICC). 

Various public events will be held throughout the project phases for residents to learn about the project and to provide input on the design of the project.

 

 

 

Hollywood Branch Project Map
To download, click  (PDF, 2.01 MB).

 

Project Schedule and Documents

Calendar of Public Events and Project Schedule*

Calendar Graphic

Preliminary Assessment

January 2009

Calendar Graphic

30 % Design Plan

June / July 2009

Calendar Graphic

Initial Public Meeting

December 9, 2009 7:00 - 9:00 p.m.
Cannon Rd. Elementary School Cafeteria, 901 Cannon Rd. Silver Spring, MD 20904

Calendar Graphic

60 % Design Plan

April 2012

Calendar Graphic

Stream Walk

May 16, 2012 6:00 - 8:00p.m.

Calendar Graphic

Stream Walk A

6:00 - 6:30 p.m.
Stream Crossing downstream of  Midland Rd. between 613 and 701 Midland Rd.

Calendar Graphic

Stream Walk B

6:00 - 6:30 p.m.
Walk down path between 13120 & 13122 Broadmore Rd. to basketball court.

Calendar Graphic

Stream Walk C

6:45 - 8:00 p.m.
Stormdrain easement between 13309 & 13311 Clifton Rd.

Calendar Graphic

90 % Design Plan

April 2013

Calendar Graphic

Construction

Spring/Summer 2014 and Spring/Summer 2015
Upper half of project (Midland Rd down to Park Property) completed in Spring/Summer 2014. Lower half of project (Upper limit of Park Property down to Cannon Rd) expected to be completed Spring/Summer 2015.

Calendar Graphic

Construction Stream Walk 1

June 17, 2014 6:30-8:30 p.m.
Start at Midland Rd crossing, then relocate to Octagon Ln and Anderson St.

Calendar Graphic

Construction Stream Walk 2

August 21, 2014 6:30-8:30 p.m.
819 Anderson St.

Calendar Graphic

Construction Stream Walk 3

April 28, 2015 6:30-8:30 p.m.
Existing pedestrian bridge on Park property. From Broadmore Rd, walk down asphalt trail between houses 13100 & 13028.

*Project schedule is tentative and dates are subject to change.