Longmead Crossing Stormwater Pond

 

As a part of the County's effort to protect our waters, the stormwater pond (Pond - 11060) within the Longmead Crossing community was selected for upgrade to help reduce stormwater pollution draining into our streams.

Various public events will be held throughout the project phases for residents to learn about the project and to provide input on the design of the project. 

 

 

 

Map of Longmead Crossing
To download, click ( PDF, 518 KB)

 

Public Events and Project Schedule

Calendar Graphic

Survey and Site Analysis

Spring 2013

Calendar Graphic

Preliminary Site Assessment

Summer 2013

Calendar Graphic

Public Meeting

February 2014
Longmead Crossing

Calendar Graphic

Concept Design Plans

Summer 2014

Calendar Graphic

Final Plans

Spring 2017

Calendar Graphic

Construction

Winter 2017 start

*Project schedule is tentative and dates are subject to change.

 

 
 
 
 