Gaithersburg West Depot Page

This page lists the currently scheduled projects for the 2019 Construction Season in the Gaithersburg West Depot service area. Click on any linked Neighborhood or Location name to read or download a Project Newsletter describing the scope of the project. Check back periodically as projects get added or scheduled. This schedule may be changed and substitutions may be made at any time due to weather and/or operational reasons.

Update: July 1, 2019
 

Project Location Project Scope Estimated Start Date Status
Bedfordshire Concrete Repairs Spring 2019  
Drew's Court Slurry Resurfacing Spring 2019  
Germantown Estates Subdivision Residential Hot Mix Asphalt Paving Summer 2019 60%
Locbury Drive Residential Hot Mix Asphalt Paving Summer 2019  
Potomac Ridge Subdivision Concrete Repairs Summer 2019  
Washingtonian Boulevard Concrete Repairs Summer 2019  

 