This page lists the currently scheduled projects for the 2019 Construction Season in the Bethesda Depot service area. Click on the Neighborhood or Location name (if underlined) to read or download a Project Newsletter describing the scope of the project. Check back periodically as projects get added or scheduled. This schedule may be changed and substitutions may be made at any time due to weather and/or operational reasons.

Updated: July 16, 2019

Project Location Project Scope Estimated Start Date Status
Armat Drive Residential Hot Mix Asphalt Paving Summer 2019  
Bannockburn Phase I Micro Resurfacing Summer 2019  
Bannockburn Phase II Micro Resurfacing Summer 2019  
Beech Avenue Micro Resurfacing Summer 2019  
Beverly Farms  Permanent Patching Summer 2019  
Chevy Chase Section 4-1 Roadway Rehabilitation Summer 2019  
Executive Boulevard Micro Resurfacing Summer 2019  
Greentree Manor Residential Hot Mix Asphalt Paving Summer 2019  