MCEO NO. 140-09:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Germantown.  Order for traffic control signs.  Install and/or remove the following traffic and/or parking control devices at the designated locations.  Install No Parking Any Time on the east side of Black Rock Road from the driveway to 16501 Black Rock Road to the south side of the one lane bridge, on the north side of Black Rock Road from 1110 feet east of the east side of the one lane bridge to the one lane bridge, and on the west side of Black Rock Road from the northern property line of 16610 Black Rock Road to the extended driveway line of 16501 Black Rock Road.  Effective Date:  6/25/09

 

MCEO NO. 141-09:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Bethesda.  Order for traffic control signs.  Install and/or remove the following traffic and/or parking control devices at the designated locations.  Remove No Thru Trucks or Buses Over � Ton on Brookside Drive, Dorset Avenue and Kennedy Drive between Bradley Boulevard (MD 191) and River Road (MD190) and on Dorset Avenue between Little Falls Parkway and River Road (MD 190).  Install No Thru Trucks or Buses Over 7000 lbs. GVW on Kennedy Drive between Bradley Boulevard (MD 191) and Dorset Avenue, on Brookside Drive between River Road (MD 190) and Dorset Avenue, and on Dorset Avenue between Little Falls Parkway and River Road (MD 190).  Effective Date:  7/02/09

 

MCEO NO. 146-09:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Bethesda Thru Streets.  Directs to erect and/or remove the following traffic control establishing those streets or parts of street as through streets, thereby granting right-of-way to traffic on said streets or parts of street at all intersecting streets.  Remove Street:  Ashburton Lane from Lone Oak Drive to and thru Stoneham Road.  Install Street:  Ashburton Lane from Lone Oak Drive to and thru Stoneham Road.  Remove Street:  Montauk Avenue from Lone Oak Drive to and thru Bells Mill Road.  Remove Street:  Montauk Avenue from Lone Oak Drive to and thru Stoneham Road.  Install Street:  Montauk Avenue from Lone Oak Drive to and thru Bells Mill Road.  Install Street Montauk Avenue from Lone Oak Drive to and thru Rockhurst Road.  Effective Date:  7/02/09

 

MCEO NO. 147-09:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Bethesda.  Order for traffic control signs.  Install and/or remove the following traffic and/or parking control devices at the designated locations.  Install Stop for southbound traffic on Pomona Drive at Carnegie Drive.  Install No Stopping Any Time on the northwest side of Pomona Drive from the northern property line of Ashburton Elementary School to 25' south of the northern driveway for Ashburton Elementary School, on the northwest side of Pomona Drive from 25" north of the southern driveway for Ashburton Elementary School to 20' south of the southern driveway for Ashburton Elementary School, and on the southeast side of Pomona Drive from 20' south of the marked crosswalk at the southern driveway for Ashburton Elementary School to 20' north of the marked crosswalk at the southern driveway for Ashburton Elementary School.  Install No Stopping School Days 8AM - 4PM on the northwest side of Pomona Drive from 25' south of the northern driveway for Ashburton Elementary School to 25' north of the southern driveway for Ashburton Elementary School.  Remove No Parking Any Time on both sides of the Ashburton Elementary School driveway from the school parking lot to Lone Oak Drive.  Remove Buses Only 8:30 AM - 9:30 AM 2:30 PM - 3:00 PM School Days for the driveway in front of the Ashburton Elementary School at Lone Oak Drive.  Effective Date:  7/02/09

 

MCEO NO. 148-09:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Germantown.  Order for traffic control signs.  Install and/or remove the following traffic and/or parking control devices at the designated locations.  Remove No Parking 7PM - 6AM on the southeast side of Amaranth Drive from 130'northeast of Middlebrook Road to 185' northeast of Middlebrook Road, on the northwest side of Amaranth Drive from 50' southwest of the driveway for 19516-19530 Amaranth Drive to 55' northeast of the driveway for 19504, and on the northwest side of Amaranth Drive from 70' southwest of the driveway for 19504 Amaranth Drive to 100' northeast of Middlebrook Road.  Remove No Parking 11:PM - 6AM on the southeast side of Amaranth Drive from 150' northeast of the driveway for the storage lot for 19501 Amaranth Drive to 35' southwest of the main driveway for 19525 Amaranth Drive, on the southeast side of Amaranth Drive from 35' northeast of the eastern most driveway for 19525 Amaranth Drive to the cul-de-sac northeast of Middlebrook Road, and on the northwest side of Amaranth Drive from the cul-de-sac at the road end northeast of Middlebrook Road to 75' northeast of the driveway for 19516-19530 Amaranth Drive.  Effective Date:  7/01/09

 

MCEO NO. 149-09:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Germantown.  Order for traffic control signs.  Install and/or remove the following traffic and/or parking control devices at the designated locations.  Install Speed Limit 30 on Hopkins Road between Clopper Road (MD 117) and Father Hurley Boulevard.  Install Speed Limit 25 on Hopkins Road between Father Hurley Boulevard and Warrior Brook Drive.  Effective Date:  7/07/09

 

MCEO NO. 150-09:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Germantown.  Order for traffic control signs.  Install and/or remove the following traffic and/or parking control devices at the designated locations.  Install Stop for eastbound traffic on Village Green Court at Village Green Circle, for westbound traffic on Village Green Circle at Village Green Circle, for southbound traffic on Rabbits Glen Court at Village Green Circle, for westbound traffic on Royal Carriage Drive at Village Green Circle, for eastbound traffic on Royal Carriage Drive at Royal Crown Drive, for northbound traffic on Comfrey Lane at Royal Carriage Drive, for northbound traffic on Hawks Nest Lane at Milestone Manor Lane, for southwest bound traffic on Hawks Nest Lane at Milestone Manor Lane, for westbound traffic on Emerald Drive at Hawks Nest Lane, for northbound traffic on Eagle View Way at Milestone Manor Lane, for westbound traffic on Eagle View Way at Milestone Manor Lane, for eastbound traffic on Sun Garden Court at Milestone Manor Lane, for northbound traffic on Tiger Lily Court at Royal Crown Drive, for northbound traffic on Purple Aster Court at Royal Crown Drive, for northbound traffic on China Aster Court at Stardrift Drive, for northbound traffic on Sparrow Court at Stardrift Drive, and for northwest bound traffic on Watercress Circle at Songbird Lane (southern intersection).  Remove Yield for northbound Hawks Nest Lane at Milestone Manor Lane, on westbound Hawks Nest Lane at Milestone Manor Lane, on westbound Emerald Drive at Hawks Nest Lane, on Eagle View Way so as to require northbound traffic to yield at the northern intersection with Milestone Manor Lane, on Eagle View way so as to require westbound traffic to yield at the western intersection with Milestone Manor Lane, on eastbound Sun Garden Court at Milestone Manor Lane, on northbound Tiger Lily Court at Royal Crown Drive, on northbound Purple Aster Court at Royal Crown Drive, on northbound China Aster Court at Stardrift Drive, on northbound Sparrow Court at Stardrift Drive, and on northbound Watercress Circle at Songbird Lane.  Install No Stopping Any Time on the southeast side of Royal Crown Drive from Observation Drive to 180' north of Observation Drive (the extended south curb line of Royal Carriage Drive), on the southeast side of Royal Crown Drive from 50' west of the traffic circle at Milestone Manor Lane/Royal Crown Court to 50' east of the traffic circle at Milestone Manor Lane/Royal Crown Court, on the northwest side of Royal Crown Drive from 50' east of the traffic circle at Milestone Manor Lane/Royal Crown Court to 50' west of the traffic circle at Milestone Manor Lane/Royal Crown Court, on the northwest side of Royal Crown Drive from 25' northeast of the bus loop entrance driveway for the elementary school to 25' southwest of the bus loop entrance driveway for the elementary school, on the northwest side of Royal Crown Drive from 40' north of Royal Carriage Drive to Observation Drive, on the east side of Milestone Manor Lane from the traffic circle at Royal Crown Drive to 50' north of the circle, on the east side of Milestone Manor Lane from 40' south of Hawks Nest Lane to 40' north of Hawks Nest Lane, on the west side of Milestone Manor Lane from 40' north of the northern school driveway to 25' south of the northern school driveway, on the west side of Milestone Manor Lane from 35' north of the southern school driveway to Royal Crown Drive, on both sides of Royal Crown Court from Royal Crown Drive to 50' south of Royal Crown Court, on both sides of Hawks Nest Lane from Milestone Manor Lane to 40' east of Milestone Manor Lane, on both sides of Royal Carriage Drive from Royal Crown Drive to 60' west of Royal Crown Drive, on the north side of Royal Carriage Drive from 30' east of the elementary school driveway to 30' west of the elementary school driveway, on the east side of Village Green Circle from 40' south of Royal Carriage Drive to 40' north of Royal Carriage Drive, and on the west side of Village Green Circle from 20' north of the marked school crosswalk at Royal Carriage Drive to 20' south of the marked school crosswalk at Royal Carriage Drive.  Install No Stopping School Days 8AM - 4PM on the west side of Milestone Manor Lane from 25' south of the northern school driveway to 35' north of the southern school driveway and on the north side of Royal Carriage Drive from 60' west of Royal Crown Drive to 30' east of the elementary school driveway.  Remove No Parking Any Time on the north side of Waters Discovery Lane from the east property line of 13005 to Observation Drive and on the south side of Waters Discovery Lane from Observation Drive to the east property line of 13004 Waters Discovery Lane.  Install Speed Limit 35 on Observation Drive from Ridge Road (MD 27) northwest to the roadway end.  Effective Date:  7/13/09

 

MCEO NO. 151-09:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Bethesda.  Order for traffic control signs.  Install and/or remove the following traffic and/or parking control devices at the designated locations.  Remove 2-Hour Parking 7AM - 7PM Monday - Friday on the west side of Citadel Avenue from 270' south of Marinelli Road to 623' south of Marinelli Road.  Remove No Parking Any Time on the west side of Citadel Avenue from 623' south of Marinelli Road to Nicholson Lane, on the west side of Huff Court from Nicholson Lane to 150' south of Nicholson Lane, and on the west side of Huff Court from 205' south of Nicholson Lane to the end of County maintenance at the White Flint Mall Driveway.  Install 2-Hour Parking 7AM - 7PM Monday - Friday on the west side of Citadel Avenue from 270' south of Marinelli Road to 605' south of Marinelli Road.  Install No Parking Any Time on the west side of Citadel Avenue from 605' south of Marinelli Road to Nicholson Lane and on the west side of Huff Court from Nicholson Lane to the end of County maintenance at the White Flint Mall Driveway.  Effective Date:  7/13/09

 

MCEO NO. 156-09:  DEPARTMENT OF TRANSPORTATION - Public Hearing - Franklin Street Proposed Sidewalk (CIP #506747).  A public hearing will be held before the County Executive (or his designee) at 2:45 p.m. on Wednesday, August 19, 2009 in the lobby level auditorium of the Executive Office Building located at 101 Monroe Street, Rockville, Maryland 20850 to consider a proposal to provide safe pedestrian travel along the south side of Franklin Street from Edgefield Road to Beach Drive, located in Kensington, Maryland within Election District 7.  The sidewalk will be 5 feet wide and will conform to the ADA requirements.  The total length of the sidewalk is 500 linear feet.  Franklin Street is classified as a secondary residential roadway and has a 60 foot wide public right-of-way.  The existing roadway is approximately 24 feet wide.  There is approximately 18 feet of available public right-of-way on the south side of Franklin Street.  The sidewalk will be installed adjacent to the existing curb and gutter.  Every effort will be made during construction to cause minimal disturbance within the public right-of-way and to the adjacent properties.  Project related data and files are available for examination in the offices of the Department of Transportation, 100 Edison Park Road, Gaithersburg, Maryland.  The phone number is 240-777-7270.  Unless otherwise approved the County, expenditures authorized by this Order plus expenditures accrued to date for this project, shall not exceed $38,153.00 and shall be made payable from funds appropriated for CIP Project No. 506747.  The sole purpose of this hearing is to obtain public comments to assist the County Executive in determining whether or not to authorize the construction of the project.  Effective Date:  7/28/09

 

MCEO NO. 157-09:  DEPARTMENT OF TRANSPORTATION - Public Hearing - Elm Street Proposed Sidewalk (CIP #506747).  A public hearing will be held before the County Executive (or his designee) at 3:30 p.m. on Wednesday, August 19, 2009 in the lobby level auditorium of the Executive Office Building located at 101 Monroe Street, Rockville, Maryland 20850 to consider a proposal to provide safe pedestrian travel along the north side of Elm Street from Claredon Road to Arlington Road, located in Bethesda, Maryland within Election District 7.  The sidewalk will be 5 feet wide and will conform to the ADA requirements.  The total length of the sidewalk is 420 linear feet.  Elm Street is classified as a secondary residential roadway and has a 60 foot wide public right-of-way.  The existing roadway is approximately 26 feet wide.  There is approximately 17 feet of available public right-of-way on the north side of Elm Street.  Installing a sidewalk along this portion of Elm Street will require narrowing of the roadway to lessen the impacts within the public right-of-way to properties adjacent to the proposed project.  There will be a two foot greenspace located between the new sidewalk and the new curb and gutter.  Every effort will be made during construction to cause minimal disturbance within the public right-of-way and to the adjacent properties.  Project related data and files are available for examination in the offices of the Department of Transportation, 100 Edison Park Road, Gaithersburg, Maryland.  The phone number is 240-777-7270.  Unless otherwise approved the County, expenditures authorized by this Order plus expenditures accrued to date for this project, shall not exceed $44,356.00 and shall be made payable from funds appropriated for CIP Project No. 506747.  The sole purpose of this hearing is to obtain public comments to assist the County Executive in determining whether or not to authorize the construction of the project.  Effective Date:  7/28/09

 

MCEO NO. 158-09:  DEPARTMENT OF TRANSPORTATION - Public Hearing - Liberty Lane Proposed Sidewalk (CIP #506747).  A public hearing will be held before the County Executive (or his designee) at 4:30 p.m. on Wednesday, August 19, 2009 in the lobby level auditorium of the Executive Office Building located at 101 Monroe Street, Rockville, Maryland 20850 to consider a proposal to provide safe pedestrian travel along the north side of Liberty Lane from Falls Road to Coldstream Drive, located in Potomac, Maryland within Election District 10.  The sidewalk will be 5 feet wide and will conform to the ADA requirements.  The total length of the sidewalk is 1,650 linear feet.  Liberty Lane is classified as a secondary residential roadway and has a 60 foot wide public right-of-way.  The existing roadway is approximately 26 feet wide.  There is approximately 17 feet of available public right-of-way on the north side of Liberty Lane.  There will be a variable greenspace of 3 to 5 feet wide located between the new sidewalk and the curb and gutter.  Every effort will be made during construction to cause minimal disturbance within the public right-of-way and to the adjacent properties.  Project related data and files are available for examination in the offices of the Department of Transportation, 100 Edison Park Road, Gaithersburg, Maryland.  The phone number is 240-777-7270.  Unless otherwise approved the County, expenditures authorized by this Order plus expenditures accrued to date for this project, shall not exceed $81,675.00 and shall be made payable from funds appropriated for CIP Project No. 506747.  The sole purpose of this hearing is to obtain public comments to assist the County Executive in determining whether or not to authorize the construction of the project.  Effective Date:  7/28/09

 

MCEO NO. 159-09:  DEPARTMENT OF TRANSPORTATION - Public Hearing - Elm Street Proposed Sidewalk (CIP #506747).  A public hearing will be held before the County Executive (or his designee) at 3:30 p.m. on Tuesday, August 25, 2009 in the lobby level auditorium of the Executive Office Building located at 101 Monroe Street, Rockville, Maryland 20850 to consider a proposal to provide safe pedestrian travel along the west side of Democracy Lane from Democracy Boulevard to Bells Mill Road, located in Potomac Maryland within Election District 10.  The sidewalk will be 5 feet wide and will conform to the ADA requirements.  The total length of the sidewalk is 4,000 linear feet.  Democracy Lane is classified as a secondary residential roadway and has a 60 foot wide public right-of-way.  The existing roadway is approximately 32 feet wide.  There is approximately 14 feet of available public right-of-way along the west side of Democracy Lane.  A 4 to 5 foot wide shoulder will be maintained with the installation of the new concrete sidewalk.  Every effort will be made during construction to cause minimal disturbance within the public right-of-way and to the adjacent properties.  Project related data and files are available for examination in the offices of the Department of Transportation, 100 Edison Park Road, Gaithersburg, Maryland.  The phone number is 240-777-7270.  Unless otherwise approved the County, expenditures authorized by this Order plus expenditures accrued to date for this project, shall not exceed $170,553.00 and shall be made payable from funds appropriated for CIP Project No. 506747.  The sole purpose of this hearing is to obtain public comments to assist the County Executive in determining whether or not to authorize the construction of the project.  Effective Date:  7/28/09

 

MCEO NO. 160-09:  DEPARTMENT OF TRANSPORTATION - Public Hearing - Elm Street Proposed Sidewalk (CIP #506747).  A public hearing will be held before the County Executive (or his designee) at 2:45 p.m. on Tuesday, August 25, 2009 in the lobby level auditorium of the Executive Office Building located at 101 Monroe Street, Rockville, Maryland 20850 to consider a proposal to provide safe pedestrian travel along the south side of Knowles Avenue/MD547 from 4210 Knowles Avenue to Summit Avenue, located in Kensington, Maryland within Election District 7.  The sidewalk will be 5 feet wide and will conform to the ADA requirements.  The total length of the sidewalk is 950 linear feet.  Knowles Avenue is classified as an arterial roadway and has a 100 foot wide public right-of-way.  The existing roadway is approximately 28 feet wide.  There is approximately 36 feet of available public right-of-way along the west side of Knowles Avenue.  The sidewalk will be installed adjacent to the curb and gutter.  Every effort will be made during construction to cause minimal disturbance within the public right-of-way and to the adjacent properties.  Project related data and files are available for examination in the offices of the Department of Transportation, 100 Edison Park Road, Gaithersburg, Maryland.  The phone number is 240-777-7270.  Unless otherwise approved the County, expenditures authorized by this Order plus expenditures accrued to date for this project, shall not exceed $83,642.00 and shall be made payable from funds appropriated for CIP Project No. 506747.  The sole purpose of this hearing is to obtain public comments to assist the County Executive in determining whether or not to authorize the construction of the project.  Effective Date:  7/28/09

 

MCEO NO. 161-09:  DEPARTMENT OF TRANSPORTATION - Public Hearing - Parkwood Drive Proposed Sidewalk (CIP #506747).  A public hearing will be held before the County Executive (or his designee) at 5:00 p.m. on Tuesday, August 25, 2009 in the lobby level auditorium of the Executive Office Building located at 101 Monroe Street, Rockville, Maryland 20850 to consider a proposal to provide safe pedestrian travel along the west side of Parkwood Drive from Franklin Street to Cedar Lane, located in Kensington, Maryland within Election District 7.  The sidewalk will be 4 feet wide and will conform to the ADA requirements.  The total length of the sidewalk is 3400 linear feet.  Parkwood Drive is classified as a secondary residential roadway and has a 60 foot wide public right-of-way.  The existing roadway is approximately 28 feet wide.  There is approximately 16 feet of available public right-of-way along the west side of Parkwood Drive.  There will be a variable greenspace located between the new sidewalk and the curb and gutter.  Every effort will be made during construction to cause minimal disturbance within the public right-of-way and to the adjacent properties.  Project related data and files are available for examination in the offices of the Department of Transportation, 100 Edison Park Road, Gaithersburg, Maryland.  The phone number is 240-777-7270.  Unless otherwise approved the County, expenditures authorized by this Order plus expenditures accrued to date for this project, shall not exceed $102,833.00 and shall be made payable from funds appropriated for CIP Project No. 506747.  The sole purpose of this hearing is to obtain public comments to assist the County Executive in determining whether or not to authorize the construction of the project.  Effective Date:  7/28/09

 

MCEO NO. 162-09:  DEPARTMENT OF LIQUOR CONTROL - FY10 Appropriation and Transfer.  It is ordered that the FY10 Department of Liquor Control working capital is as follows:  Personnel Costs - $24,245,040, Operating Expense - $13,713,570,  Capital Outlay - $736,650.  Total working capital is $38,695,260.  It is ordered that the Director of Finance transfer from the Liquor Control Fund to the General Fund, at the end of each of the first three quarters of the fiscal year, an amount equal to one fourth of the amount of $30,035,382.  This amount includes the transfer for: earnings of $23,210,750; technology modernization costs of $740,600; overhead of $2,424,500; and debt service costs of $3,659,532.  The County Executive on the advice of the Department of Liquor Control, the Office of Management and Budget, and the Department of Finance will determine the final quarterly transfer at the end of the fiscal year, but which include the amount referred to below.  It is ordered that a portion of the amount transferred to the general fund relating to debt service ($3,656,532) payable from DLC pledged revenues, be transferred directly to U.S. Bank National Association, in accordance with the amounts and timeframes stipulated in the Trust Indenture.  Effective Date:  7/28/09

 