Executive Orders


Return to Table of Contents

 

MCEO NO. 262-09:  DEPARTMENT OF TRANSPORTATION - Acceptance of Option Contract with Siegfried Kurt Temp Chapman Avenue Extended, CIP No. 500719.  The Option Contract between Siegfried Kurt Temp and Montgomery County, Maryland for the purchase of the property rights required for the above-referenced project is hereby accepted.  Contract obtained in the amount of $85,250.00.  the County Attorney is hereby directed to take all necessary steps to acquire the above described property rights, including any improvements located within the areas to be acquired.  Effective Date:  11/20/09

 

MCEO NO. 272-09:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Germantown.  Order for traffic control signs directs to install and/or remove the following traffic, and/or parking control devices at the designated locations.  Install No Parking Any Time on both sides of Observation Drive from Stringtown Road to Roberts Tavern Drive, including the cul-de-sac created by the temporary end of Observation Drive, on the perimeter of the medians on Observation Drive from Stringtown Road to Roberts Tavern Drive, on both sides of Roberts Tavern Drive from Observation Drive to and including the cul-de-sac formed by the temporary end of Roberts Tavern Drive, and on the perimeter of the medians on Roberts Tavern Drive from Observation Drive to the cul-de-sac formed by the temporary end of Roberts Tavern Drive.  Effective Date:  12/01/09

 

MCEO NO. 273-09:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Silver Spring.  Order for traffic control signs directs to install and/or remove the following traffic, and/or parking control devices at the designated location.  Install Permit Parking Only 9AM - 5PM Monday - Friday Glenmont, on both sides of Epping Court from Denley Road to the road terminus north of Denley Road.  Effective Date:  12/04/09

 

MCEO NO. 274-09:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Silver Spring Thru Streets.  Directs to erect and/or remove the following traffic control establishing those streets or parts of street as through streets, thereby granting right-of-way to traffic on said streets or parts of street at all intersecting streets.  Remove Street: Chickasaw Drive from 11th Avenue to Prince George's County line.  Install Street: Chickasaw Drive from 11th Avenue to and through Prince George's County line.  Remove Street: 11th Avenue from Carroll Avenue to Quebec Street.  Install Street: 11th Avenue from Carroll Avenue to and through Quebec Street.  Remove Street: Ruatan Street from 11th Avenue to and through 11th Avenue.  Install Street: Ruatan Street from 11th Avenue (western intersection) to and through 11th Avenue (eastern intersection).  Remove Street: Quebec Street from Ruatan Street to Prince George's County Line.  Effective Date:  12/02/09

 

MCEO NO. 275-09:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Silver Spring.  Order for traffic control signs directs to install and/or remove the following traffic, and/or parking control devices at the designated locations.  Remove Stop On Osage Street at Carroll Avenue so as to stop westbound traffic on Osage Street, on Osage Street at Chickasaw Drive so as to stop east and west bound traffic on Osage Street, on Osage Street at Tahona Drive so as to stop northbound traffic on Osage Street, on Eleventh Avenue at Carroll Avenue so as to stop westbound traffic on Eleventh Avenue, on 11th Avenue so as to require southwest bound traffic to stop on Ruatan Street (eastern most intersection), on 11th Avenue so as to require northeast bound traffic to stop at Quebec Street, on Quebec Street at Ruatan Street so as to stop northwest bound traffic on Quebec Street, on Quebec Terrace so as to require southeast bound traffic to stop at Ruatan Street, on Ruatan Street so as to require southeast bound traffic to stop at 11th Avenue (western most intersection), on Tahona Drive at Quebec Street so as to stop north and southwest bound traffic on Tahona Drive, on Tahona Drive at Chickasaw Drive so as to stop southbound traffic on Tahona Drive, on 10th Avenue at Navahoe Drive so as to stop southbound traffic on 10th Avenue, on 10th Avenue at Osage Street so as to stop northbound traffic on 10th Avenue, and on Chickasaw Drive at 11th Avenue so as to stop northwest bound traffic on Chickasaw Drive.  Install Stop for westbound traffic on Osage Street at Carroll Avenue, for eastbound traffic on Osage Street at Tahona Drive, for westbound traffic on 11th Avenue at Carroll Avenue, for southbound traffic on 11th Avenue at Navahoe Drive, for northeast and southwest bound traffic on Tahona Drive at Quebec Street, for southbound traffic on 10th Avenue at Navahoe Drive, and for northbound traffic on 10th Avenue at Osage Street.  Remove One Way on 11th Avenue between Quebec Terrace and Quebec Terrace so as to make 11th Avenue one way in a northeasterly direction.  Install One Way on 11th Avenue in a northeasterly direction from Quebec Street to Ruatan Street.  Effective Date:  12/02/09

 

MCEO NO. 276-09:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Silver Spring. Order for traffic control signs directs to install and/or remove the following traffic, and/or parking control devices at the designated locations.  Remove No Parking Any Time on both sides of Hathaway Drive from Georgia Avenue (Md 97) to a point 60' west of Georgia Avenue (MD 97).  Install No Parking Any Time on the south side of Hathaway Drive from 80 feet west of Georgia Avenue (MD 97) to Georgia Avenue (MD 97) and on the north side of Hathaway Drive from Georgia Avenue (MD 97) to 60 feet west of Georgia Avenue (MD 97).  Effective Date:  12/07/09

 

MCEO NO. 277-09:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Silver Spring.  Order for traffic control signs directs to install and/or remove the following traffic, and/or parking control devices at the designated location.  Install No Parking Any Time on Hardy Avenue around the cul-de-sac island at the terminus of Hardy Avenue east of Ivanhoe Street.  Effective Date:  12/10/09

 

MCEO NO. 278-09:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Germantown. Order for traffic control signs directs to install and/or remove the following traffic, and/or parking control devices at the designated locations.  Remove No Stopping Any Time on the southeast side of Royal Crown Drive from Observation Drive to 180' north of Observation Drive (the extended south curb line of Royal Carriage Drive).  Install No Stopping Any Time on the southeast side of Royal Crown Drive from Observation Drive to 130' north of Observation Drive (the south edge of the driveway apron at 12616 Royal Carriage Drive.  Effective Date:  12/10/09


MCEO NO. 279-09:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Silver Spring.  Order for traffic control signs directs to install and/or remove the following traffic, and/or parking control devices at the designated locations.  Remove No Parking Any Time on the west side of Selway Lane from Seminary Road to Brookville Road, on the west side of Selway Lane from Seminary Road to Seminary Place, and on the east side of Selway Lane from Seminary Road to Seminary Place.  Install No Parking Any Time on the west side of Selway Lane from Seminary Place to Seminary Road and on the east side of Selway Lane from 85 feet south of Seminary Place to  Seminary Place.  Remove Stop on Selway Lane so as to stop northbound traffic at Seminary Place.  Install Stop on northbound Selway Lane at Seminary Place and southbound Selway Lane at Seminary Road.  Effective Date:  12/18/09

 

MCEO NO. 281-09:  DEPARTMENT OF FIRE AND RESCUE SERVICE - Fire Lane Establishment Order to post fire lane signs and paint curbs/pavement (painting optional) as identified below.  When signs and paint work have been completed, this order will authorize the enforcement of this Fire Lane by appropriate police and fire officials.  Location:  Harmony Hills Elementary School, 13407 Lydia Street.  Signs must be posted so that it is not possible to park a vehicle without being in sight of a sign.  Signs may be no farther apart than 100 feet.  Paint must be traffic yellow with line of sufficient width to be readily identifiable/readable by motor vehicle operators.  Effective Date:  11/10/09

 

MCEO NO. 282-09:  DEPARTMENT OF FIRE AND RESCUE SERVICE - Fire Lane Establishment Order to post fire lane signs and paint curbs/pavement (painting optional) as identified below.  When signs and paint work have been completed, this order will authorize the enforcement of this Fire Lane by appropriate police and fire officials.  Location:  Layhill Overlook, Clay Rock La., Wye River Way, 3000 - 3049 Big Bear Ter.  Signs must be posted so that it is not possible to park a vehicle without being in sight of a sign.  Signs may be no farther apart than 100 feet.  Paint must be traffic yellow with line of sufficient width to be readily identifiable/readable by motor vehicle operators.  Effective Date:  12/03/09

 

MCEO NO. 283-09:  DEPARTMENT OF GENERAL SERVICES - Condemnation Authorization Ralph E. and Judy Wright New Clarksburg Fire Station CIP Project No. 450300.  The County Attorney and the Department of General Services are hereby directed to acquire by whatever means necessary, including condemnation, the following described property, in its entirety, for the Clarksburg Fire Station Project and other public use, Liber/Folio 15590/0554, Account No. 25716, Owner Ralph E. & Judy A. Wright, Approx. 2.00 ac.  Effective Date:  12/21/09

 

MCEO NO. 284-09:  DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS - Designation of Nonprofit Organizations to Purchase or Rent MPDU's.  Based upon the recommendation of the Director of the Department of Housing and Community Affairs, it has been determined that the following organization has demonstrated its ability to operate and maintain affordable housing satisfactorily and is eligible for participation in the MPDU program for the rental or purchase of MPDU's. St. Luke's House, Inc., 6040 Southport Drive, Bethesda, MD 20814.  Effective Date:  12/23/09

 

MCEO NO. 285-09:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Rockville.  Order for traffic control signs directs to install and/or remove the following traffic, and/or parking control devices at the designated locations.  Remove No Thru Trucks Over � Ton on Piney Meetinghouse Road between Glen Road and River Road (MD 190).  Install No thru Trucks Over 7000 lbs. GVW on Piney Meetinghouse Road between Glen Road and River Road (MD 190).  Effective Date:  12/22/09

 

MCEO NO. 286-09:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Bethesda. Order for traffic control signs directs to install and/or remove the following traffic, and/or parking control devices at the designated locations.  Remove Stop for eastbound traffic on York Lane at Custer Road.  Install Four-Way Stop at the intersection of Custer Road/York Lane/Goddard Road (southeast ramp).  Install Stop for westbound traffic on Goddard Road (northeast ramp) at Custer Road.  Install Yield for eastbound traffic on the northeast Goddard Road ramp at Goddard Road.  Effective Date:  12/23/09

 

MCEO NO. 287-09:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Bethesda. Order for traffic control signs directs to install and/or remove the following traffic, and/or parking control devices at the designated location.  Install Four-Way-Stop at the intersection of Edgemoor Lane and Exeter Road.  Effective Date:  12/24/09

 

MCEO NO. 288-09:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Silver Spring.  Order for traffic control signs directs to install and/or remove the following traffic, and/or parking control devices at the designated locations.  Remove Four-Way Stop on Luzerne Avenue and on Second Avenue so as to require all traffic to stop at the intersection, on Hanover Street and on Second Avenue so as to require all traffic to stop at the intersection, and on Hanover Street and on Third Avenue so as to require all traffic to stop at the intersection.  Install Four-Way Stop at the intersection of Luzerne Avenue and Second Avenue, at the intersection of Hanover Street and Second Street, and at the intersection of Hanover Street and Third Avenue.  Remove No Parking Any Time on the north side of Hanover Street from 16th Street to Second Avenue, on the south side of Hanover Street from 16th Street to a point 150 feet west of 16th Street, and on the east side of Sutton Place from Seminary Road southward to the entrance to the public parking lot, on both sides of Columbia Boulevard from Seminary Road to Sixteenth Street.  Install No Parking Any Time on the north side of Hanover Street from 16th Street to Second Avenue, on the south side of Hanover Street from 150' west of 16th Street to 16th Street, on the south side of Glen Ross Road from Louis Avenue to Section Avenue, on the east side of Sutton Place from the entrance to the public parking lot to Seminary Road, on the east side of Columbia Boulevard from Sixteenth Street to Luzerne Avenue, on the east side of Columbia Boulevard from 420' north of Luzerne Avenue to 450' north of Luzerne Avenue, on the east side of Columbia Boulevard from 500' north of Luzerne Avenue to Seminary Road, and on the west side of Columbia Boulevard from Seminary Road to 170' south of Seminary Road.  Remove All-Way Stop on Grace Church Road. on Third Avenue so as to require all traffic to stop at the intersection, and on Glenridge Road and on Luzerne Avenue so as to require all traffic to stop at the intersection. Install All-Way Stop at the intersection of Grace Church Road and Third Avenue, and at the intersection of Glenridge Road and Luzerne Avenue.  Remove No Parking 9:00 AM to 5:00 PM Monday thru Friday on both sides of Glen Ross Road from Luzerne Avenue to Second Avenue.  Install No Parking 9AM - 5PM Monday - Friday on both sides of Glen Ross Road from Luzerne Avenue to Second Avenue, on the east side of Columbia Boulevard from Luzerne Avenue to 240' north of Luzerne Avenue, and on the west side of Columbia Boulevard from 170' south of Seminary Road to Sixteenth Street.  Remove No Parking 9:00 A.M. to 6:00 P.M. Except Sat. & Sun. on the northwest side of Sutton Place from Seminary Road to Stratton Road.  Remove No Parking 9:00 AM to 6:00 PM Mon thru Fri on the west side of Sutton Place from Stratton Road to Rookwood Road.  Install No Parking 9AM - 6PM Except Saturday and Sunday on the west side of Sutton Place from Seminary Road to Stratton Road.  Install No Parking 9AM - 6PM Monday - Friday on the west side of Sutton Place from Stratton Road to Rookwood Road.  Remove One Way on Columbia Boulevard from Seminary Road to Rookwood Road so as to make Columbia Boulevard one-way in a southerly direction.  Remove No Parking 9:00 AM - 5:00 PM Monday - Friday on both sides of Columbia Boulevard from Seminary Road to Sixteenth Street  Remove Two-Hour Parking 9:00 AM - 6:00 PM Except Sunday on the east side of Columbia boulevard from a point 450' north of Luzerne Avenue to a point 500' north of Luzerne Avenue.  Install Two-Hour Parking 9AM - 6PM Except Sunday on the east side of Columbia Boulevard from 450' north of Luzerne Avenue to 500' north of Luzerne Avenue.  Remove No Parking School Days 7:30 AM - 4:00PM on the north side of Luzerne Avenue from Louis Avenue eastward to the Woodlin Elementary School property line.  Effective Date:  12/24/09

 

MCEO NO. 001-10:  DEPARTMENT OF FIRE AND RESCUE SERVICE - Fire Lane Establishment Order to post fire lane signs and paint curbs/pavement (painting optional) as identified below.  When signs and paint work have been completed, this order will authorize the enforcement of this Fire Lane by appropriate police and fire officials.  Location:  Glenfield North, 12600 - 12695 English Orchard Ct.  Signs must be posted so that it is not possible to park a vehicle without being in sight of a sign.  Signs may be no farther apart than 100 feet.  Paint must be traffic yellow with line of sufficient width to be readily identifiable/readable by motor vehicle operators.  Effective Date:  12/09/09

 

MCEO NO. 002-10:  DEPARTMENT OF FIRE AND RESCUE SERVICE - Fire Lane Establishment Order to post fire lane signs and paint curbs/pavement (painting optional) as identified below.  When signs and paint work have been completed, this order will authorize the enforcement of this Fire Lane by appropriate police and fire officials.  Location:  Buffington Building II, East side of MD. Rt. 355, 325 feet North of Stringtown Rd.  Signs must be posted so that it is not possible to park a vehicle without being in sight of a sign.  Signs may be no farther apart than 100 feet.  Paint must be traffic yellow with line of sufficient width to be readily identifiable/readable by motor vehicle operators.  Effective Date:  12/18/09

 

MCEO NO. 003-10:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Wheaton/Glenmont. Order for traffic control signs directs to install and/or remove the following traffic, and/or parking control devices at the designated locations.  Remove No Parking Any Time on the east side of Locksley Lane from Randolph Road to a point 165' north of Randolph Road, on the west side of Locksley Lane from a point 165' north of Randolph Road to Randolph Road, and on the west side of Locksley Lane from 50' north of Hawkesbury Lane to Hawkesbury Lane.  Remove No Parking School Days 7:30AM - 4:00PM on the east side of Locksley Lane from a point 165' north of Randolph Road to Beaumont Road, on the west side of Locksley Lane from Hawkesbury Lane to a point 165' north of Randolph Road, and on the west side of Locksley Lane from Beaumont Road to a point 50' north of Hawkesbury Lane.  Install No Parking School Days 7:30AM - 4PM on the west side of Locksley Lane from Beaumont Road to 155' north of Hawkesbury Lane, on the west side of Locksley Lane from Hawkesbury Lane to 165' north of Randolph Road, and on the east side of Locksley Lane 165' north of Randolph Road to Beaumont Road.  Install No Parking Any Time on the west side of Locksley Lane from 155' north of Hawkesbury Lane to Hawkesbury Lane, on the west side of Locksley Lane from 165' north of Randolph Road to Randolph Road, and on the east side of Locksley Lane from Randolph Road to 165' north of Randolph Road.     Effective Date:  01/04/10

 

MCEO NO. 004-10:  DEPARTMENT OF TRANSPORTATION -Traffic Order - Silver Spring Thru Streets.  Directs to erect and/or remove the following traffic control establishing those streets or parts of street as through streets, thereby granting right-of-way to traffic on said streets or parts of street at all intersecting streets.  Remove Street: Brantford Avenue from New Hampshire Avenue (MD 650) to Eastbourne Drive.  Install Street: Brantford Avenue from New Hampshire Avenue (MD650) to Lima Drive.  Install Street: Brantford Avenue from Lima Drive to Eastbourne Drive.  Remove Street: Jackson Road from New Hampshire Avenue to Willowwood Lane.  Install Street:  Jackson Road from New Hampshire Avenue (MD 650) to Willow Wood Drive.  Effective Date:  01/06/10

 

MCEO NO. 005-10:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Silver Spring.  Order for traffic control signs directs to install and/or remove the following traffic, and/or parking control devices at the designated locations.  Install School Zone on Jackson Road from New Hampshire Avenue (MD 650) to 400' east of Renick Lane.  Install Fines Double School Days 7:15AM - 4PM on Jackson Road from New Hampshire Avenue (MD 650) to 400' east of Renick Lane.  Remove No Parking Any Time on the north side of Jackson Road from 128' east of the easternmost school driveway west to New Hampshire Avenue (MD 650), on the south side of Nora Drive from New Hampshire Avenue (Md. 650) to a point 80' east of New Hampshire Avenue (Md. 650), on the south side of Tanley Road from Md. Rt. 650 to a point 150' east.  On the north side of Tanley Road from New Hampshire Avenue to Renick Lane, on the south side of Tanley Road from a point approximately 265' west of New Hampshire Avenue to New Hampshire Avenue, on the south side of Brantford Avenue from New Hampshire Avenue to a point 450' east of New Hampshire Avenue, on the south side of Brantford Avenue from 430' west of Eastbourne Drive to and including Eastbourne Drive, on the north and south sides of the Jackson Road Elementary School driveway from Jackson Road to Jackson Road, on the north side of Jackson Road from Renick Lane to New Hampshire Avenue. (Md. 650), and on the north and south side of the White Oak Jr. High School driveway from the parking lot on the east to the service road on the west.  Install No Stopping Any Time on the north side of Jackson Road from 35' east of the eastern most Jackson Road Elementary School driveway to New Hampshire Avenue (MD 650), on the south side of Jackson Road from 35' west of Kerwood Road to 35' east of Kerwood Road, on the south side of Jackson Road from 40' west of Arbie Road to 35' east of Arbie Road, on the south side of Jackson Road from 40' west of Renick Lane to 35' east of Renick Lane, on the west side of Renick Lane from Jackson Road to 45' south of Jackson Road, on the east side of Renick Lane from 60' south of Jackson Road to Jackson Road, on the west side of Arbie Road from Jackson Road to 45' south of Jackson Road, on the east side of Arbie Road from 65' south of Jackson Road to Jackson Road, on the west side of Kerwood Road from Jackson Road to 45' south of Jackson Road, on the east side of Kerwood Road from 60' south of Jackson Road to Jackson Road.  Remove Stop on Renick Lane at Tanley Road so as to stop north and south bound traffic on Renick Lane, on Nora Drive at Renick Lane so as to stop north and southbound traffic on Nora Drive, on Lima Drive at Brantford Avenue so as to stop northeast and southwest bound traffic on Lima Drive, on David Drive at Sarah Drive so as to stop north and south bound traffic on David Drive, on the western driveway for the Jackson Road Elementary School at Jackson Road so as to stop southbound traffic on the driveway, and on the driveway to the parking lot for the Jackson Road Elementary School at Jackson Road so as to stop southbound traffic on the driveway.  Install Stop for northbound and southbound traffic on Renick Lane at Tanley Road, on southbound and northbound Renick Lane at Kerwood Road, on southbound Renick Lane at Tracy Drive, for southeast bound traffic on Arbie Road at Renick Lane, for northeast bound traffic on Kerwood Court at Kerwood Road, for eastbound and westbound traffic on Nora Drive at Renick Lane, for southeast bound traffic on Tanley Road at Sarah Drive for eastbound traffic on Kathryn Road at Caplinger Road,  for southwest bound traffic on Tiffany Road at Kathryn Road, and for northbound and southbound traffic on David Drive at Sarah Drive.  Install No Parking Any Time on the south side of Nora Drive from New Hampshire Avenue (MD 650) to 80' east of New Hampshire Avenue (MD 650), on the south side of Tanley Road from New Hampshire Avenue (MD 650) to 150' east of New Hampshire Avenue (MD 650), on the north side of Tanley Road from Renick Lane to New Hampshire Avenue (MD 650), on the south side of Tanley Road from 265' west of New Hampshire Avenue (MD 650) to New Hampshire Avenue (MD 650). On the south side of Brantford Avenue from New Hampshire Avenue (MD 650) to 450' east of New Hampshire Avenue (MD 650), and on the south side of Brantford Avenue from 430' west of Eastbourne Drive to the extended east curb line of Eastbourne Drive.  Remove One-Way for the driveway in front of the Jackson Road Elementary School from Jackson Road to Jackson Road to the parking lot in a westerly direction and for the White Oak Jr. High School driveway so as to indicate one way traffic in a counter clockwise direction.  Remove Busses Only 8:00AM-9:00AM, 3:00PM-4:00PM School Days for the driveway in front of the Jackson Road Elementary School.  Remove No Parking School Days 7:30 a.m. to 4:00 p.m. on the south side of the parking lot off the driveway in front of the White Oak Junior High School from the west edge of the parking lot to a point 75' eastward.  Effective Date:  01/06/10

 

MCEO NO. 006-10:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Silver Spring.  Order for traffic control signs directs to install and/or remove the following traffic, and/or parking control devices at the designated locations.  Remove Four-Way Stop at Second Avenue and Luzerne Avenue and at Second Avenue and Hanover Street.  Effective Date:  01/06/10

 

MCEO NO. 007-10:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Bethesda.  Order for traffic control signs directs to install and/or remove the following traffic, and/or parking control devices at the designated location.  Install No Left Turn School Days 8AM - 4PM for eastbound traffic on Franklin Street at the driveway of Kensington Parkwood Elementary School.  Effective Date:  01/06/10

 

MCEO NO. 008-10:  DEPARTMENT OF TRANSPORTATION - Acceptance of Option Contract with Inderjit and Harinder Singh Travilah Road Improvements, CIP No. 500101.  The Option Contract between Inderjit and Harinder Singh and Montgomery County, Maryland for the purchase of the property rights required for the above-referenced project is hereby accepted.  Contract obtained in the amount of $4,875.00.  The interest accruing in the Circuit Court in Miscellaneous Petition No. 22202M will be paid to the property owners, in addition to the contract price of $4,875.00.  The County Attorney is hereby directed to take all necessary steps to acquire the above described property rights, including any improvements located within the areas to be acquired.  Effective Date:  01/12/10

 

MCEO NO. 009-10:  DEPARTMENT OF TRANSPORTATION - Acceptance of Option Contract with William Joseph McDonald and Virginia Babin McDonald Needwood Road Sidewalk, CIP No. 500010.  The Option Contract between William Joseph McDonald and Virginia Babin McDonald and Montgomery County, Maryland for the purchase of the property rights required for the above-referenced project is hereby accepted.  Contract obtained in the amount of $8,608.00.  The County Attorney is hereby directed to take all necessary steps to acquire the property rights, including any improvements located within the areas to be acquired.  Effective Date:  01/12/10

 

MCEO NO. 010-10:  DEPARTMENT OF TRANSPORTATION - Acceptance of Option Contract with Ronald L. and Joyce F. Brigham Travilah Road Improvements, CIP No. 500101.  The Option Contract between Ronald L. and Joyce F. Brigham and Montgomery County, Maryland for the purchase of the property rights required for the above-referenced project is hereby accepted.  Contract obtained in the amount of $1,676.00.  the interest accruing in the Circuit Court in Miscellaneous Petition No. 22450M will be paid to the property owners, in addition to the contract price of $1,676.00.  The County Attorney is hereby directed to take all necessary steps to acquire the above described property rights, including any improvements located within the arrears to be acquired.  Effective Date:  01/12/10

 

MCEO NO. 011-10:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Wheaton/Glenmont.  Order for traffic control signs directs to install and/or remove the following traffic, and/or parking control devices at the designated location.  Remove Stop on Aspen Hill Court at Aspen Hill Road so as to stop northwest bound traffic on Aspen Hill Court.  Effective Date:  01/06/10

 

MCEO NO. 012-10:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Wheaton/Glenmont.  Order for traffic control signs directs to install and/or remove the following traffic, and/or parking control devices at the designated locations.  Remove No Parking Any Time on the north side of Arctic Court from Arctic Avenue to a point 50' east of Arctic Avenue, on the south side of Arctic Court from Arctic Avenue to a point 136' east of Arctic Avenue, on the perimeter of the circle on Arctic Court east of Arctic Avenue.  Install No Parking Any Time on the north side of Arctic Court from 50' east of Arctic Avenue to Arctic Avenue, on the south side of Arctic Court from Arctic Avenue to 136' east of Arctic Avenue, and around the perimeter of the Arctic Court traffic island, east of Arctic Avenue.  Effective Date:  01/06/10

 

MCEO NO. 013-10:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Wheaton/Glenmont.  Order for traffic control signs directs to install and/or remove the following traffic, and/or parking control devices at the designated locations.  Remove Stop on Bartram Street so as to require southeast-bound traffic to stop at Arbutus Avenue.  Install Stop for southeast bound traffic on Bartram Street at Arbutus Avenue.  Effective Date:  01/06/10

 

MCEO NO. 014-10:  DEPARTMENT OF TRANSPORTATION - Traffic Order - Wheaton/Glenmont.  Order for traffic control signs directs to install and/or remove the following traffic, and/or parking control devices at the designated locations.  Remove Stop on Bestor Drive at Blackmon Drive so as to stop east and westbound traffic on Bestor Drive and on Blackmon Drive at Merton Road so as to stop northeast bound traffic on Blackmon Drive.  Install Stop for eastbound and westbound traffic on Bestor Drive at Blackmon Drive and for northeast bound traffic on Blackmon Drive at Merton Road.  Remove No Parking Any Time on the north side of Bestor Drive from a point 135' west of Blackmon Drive to a point 215' west of Blackmon Drive (80') and on the north side of Bestor Drive from a point 335' west of Blackmon Drive to a point 410' west of Blackmon Drive (75').  Install No Parking Any Time on the north side of Bestor Drive from 158' west of Blackmon Drive to 200' west of Blackmon Drive and on the north side of Bestor Drive from 352' west of Blackmon Drive to 393' west of Blackmon Drive.  Effective Date:  01/06/10

 

MCEO NO. 018-10:  DEPARTMENT OF PERMITTING SERVICES - Street Acceptance of Roads for Maintenance MCDPS Permit Nos. 219118, 245183 and 246120.  This Executive Order certifies that construction of the following named streets has been completed in accordance with all applicable provisions of the Montgomery County Road Construction Code as specified in the above-captioned permit.  The materials used in the construction of these streets were tested and found to be in compliance with County specifications.  Subdivision: Woodstock, Peach Grove Lane.  Subdivision: Alpine Forest, Sheffield Manor Road.  Subdivision:  Fairland View, Stravinsky Drive.  It is recommended that Montgomery County, Maryland, accept the roads described above for maintenance.  Effective Date:  01/12/10


MCEO NO. 019-10:  DEPARTMENT OF PERMITTING SERVICES - Street Acceptance of Roads for Maintenance MCDPS Permit Nos. 240451 and 240596.  This Executive Order certifies that construction of the following named streets has been completed in accordance with all applicable provisions of the Montgomery County Road Construction Code as specified in the above-captioned permit.  The materials used in the construction of these streets were tested and found to be in compliance with County specifications.  Subdivision: Summerfield Crossing, Gorman Circle, Gorman Drive, and Ethel Rose Way.  Subdivision: Verbits Acres, Blackburn Road.  It is recommended that Montgomery County, Maryland, accept the roads described above for maintenance.  Effective Date:  01/12/10


MCEO NO. 020-10:  DEPARTMENT OF PERMITTING SERVICES - Street Acceptance of Roads for Maintenance MCDPS Permit Nos. GP 94-26, 240404.  This Executive Order certifies that construction of the following named streets has been completed in accordance with all applicable provisions of the Montgomery County Road Construction Code as specified in the above-captioned permit.  The materials used in the construction of these streets were tested and found to be in compliance with County specifications.  Subdivision: White Flint North, Citadel Avenue.  Subdivision: Greenway Village, Arora Hills Drive, Inkberry Drive, Meadowsweet Road, Mistflower Drive, and Serviceberry Drive.  It is recommended that Montgomery County, Maryland, accept the roads described above for maintenance.  Effective Date:  01/12/10

 

 

 

Return to Table of Contents